My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
309 E MAGNOLIA AVE 2022-02-01
>
Address Records
>
E MAGNOLIA AVE
>
309
>
309 E MAGNOLIA AVE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 1:56:29 PM
Creation date
5/3/2021 1:55:36 PM
Metadata
Fields
Template:
Address Document
Street Name
E MAGNOLIA AVE
Street Number
309
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f�' Uo2-oa3 <br />�30� Mayol,a• <br />CJR Engineering <br />Civil — Structural Engineering <br />Comprehensive Project Management <br />14602 15m PL W Phone: (425) 269-5204 <br />Lynnwood, WA 98087-6043 Fax: (425) 671-0003 <br />or OSB layer on top of the T&G roof deck, this layer will have to be removed and <br />reinstalled with new one. The T&G sheathing will be removed in its entirety and <br />replaced with sheathing with 4x8 plywood boards. <br />It is my professional opinion that framing that supports the roof (rafters and diagonal <br />struts) in general suffered only limited surface fire damage (charring) and have <br />adequate capacity to continue to perform its function. <br />If anything else is required regarding this matter, please call me at (425) 269-5204, or <br />email to clemens(a'-)cireng.com . <br />Sincerely, <br />CJR Engineering <br />C -- ns J. �Rossel'l,-)P.E. <br />74 wJ. oss� t <br />2/03/21 <br />r01 29133 <br />k��e��'i,\LISTER% .� <br />I+�y'S1101INVALti�C� <br />
The URL can be used to link to this page
Your browser does not support the video tag.