Laserfiche WebLink
3/17/2021 City of Everett Page 2' - <br />8:3"%54AM <br />INSPECTION ACTIVITY REPORT <br />3/16/2021 3/16/2021 ELEC 09-FINAL SKB APPRVD=PERK as noted (3/12/2021 1:43 PM CRB) <br />Tawnya, I am unable to schedule the <br />electrical inspections from the etrakit <br />system only the building part. This is why <br />Terri has been helping me. <br />We have made our final electrical <br />corrections (FINAL) and I would like to <br />schedule a re -inspection for Tues Mar 16. <br />Can you please schedule and confirm? <br />Thank you. <br />Christopher Villa <br />Allive Properties, LLC <br />in. 425.736.3292 <br />www.alliveproperties.com <br />(3/16/2021 11:21 AM SKB) <br />Contractor moving GFCI protection for a <br />garage door opener receptacle to over <br />current device in panel. <br />INSP12 <br />CWSYSTEMS <br />