My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 OAKES AVE 2022-02-24
>
Address Records
>
OAKES AVE
>
2801
>
2801 OAKES AVE 2022-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 11:18:00 AM
Creation date
5/3/2021 3:36:28 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />087100-8 /�'L <br />2.11 GASKETS AND SWEEPS <br />A. Manufacturer: <br />1. Listed in Door Hardware Schedule: Pemko <br />2. Approved Substitutions: National Guard <br />B. General: Except as otherwise indicated, provide continuous weatherstripping at each edge of <br />every exterior door leaf. Provide type, sizes and profiles indicated as drawn or scheduled. <br />C. Fasteners: Provide non -corrosive fasteners as recommended by the manufacturer for <br />applications indicated. <br />D. Replaceable seal strips: Provide only those units where resilient or flexible seal strip is easily <br />replaceable and readily available from stocks maintained by the manufacturer. <br />E. Perimeter weatherstripping: Flexible, hollow neoprene bulb or loop insert, conforming to MIL <br />R 6055, Class H, Grade 40. <br />F. Weatherstripping at Door Bottoms: Provide door bottoms consisting of contact type resilient <br />insert and metal housing of design and size indicated. <br />G. Gaskets and sweeps shall be warranted for a period of three years. <br />2.12 THRESHOLDS <br />A. Manufacturer: <br />1. Listed in Door Hardware Schedule: Peniko <br />2. Approved Substitutions: National Guard <br />B. Except as otherwise indicated provide standard metal threshold unit of type, size and profile as <br />detailed or scheduled. <br />C. Where there is conflict between scheduled thresholds and details, details shall have <br />precedence. Revise details only if necessary to comply with handicap accessibility <br />requirements. Notify the Architect of such required modifications. <br />D. Thresholds and related items shall be warranted for a period of three years, abrasive coatings <br />shall be warranted for a period of ten years. <br />2.13 SILENCERS <br />A. Manufacturers: <br />1. Listed in Door Hardware Schedule: Rockwood <br />2. Approved Substitutions: Trimco <br />2.14 FINISHES <br />A. Exposed surfaces of hardware shall be Satin Stainless Steel (US32D, 630), unless otherwise <br />indicated. <br />B. The designations used in the schedule and elsewhere to indicate hardware finishes are the <br />industry recognized standard commercial finishes common to the product's manufacturer listed. <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Under provisions of Section 01040, examine and verify that substrates and project site <br />conditions are ready to receive work of this section. <br />B. Do not begin installation until finishes indicated to be field applied have been applied to doors, <br />frames, and similar items requiring project site finishing and are thoroughly dry and cured. <br />
The URL can be used to link to this page
Your browser does not support the video tag.