Laserfiche WebLink
0 <br />0 <br />vii. Provide floatable material separator per City of Everett Standard drawing 413 or 414 on <br />the drain line from the garage catch basins. Locate at the right-of-way prior to discharge <br />to the sewer. <br />Response: Agree. Floatable material separator was added to Sheet C4.0 <br />viii. Update the drainage report to state that, per interim policy 2-11, stormwater treatment <br />(minimum requirement #6), is not required in the combined sewer area. <br />Response: Agree. This has been updated for Minimum Requirement #6. <br />If you have any questions concerning this deviation request, please contact Rebekah Weston at rebekah _redbarn- <br />engineering.com or (206) 200-7174. <br />W,&a CJeg— <br />Thanks. <br />Rebekah Weston, PE <br />President & Principal Civil Engineer <br />3 3 <br />9/5/2018 <br />