Laserfiche WebLink
2019 System Development Fee Calculations <br />Permit#: <br />B1804-011 <br />Additional Notes: <br />Project Address: <br />1020 N Broadway <br />Previous Building=Restaurant with Occupancy Load =100 and Mini Mart with 1176sf. Reusing existing 1" water meter for irrigation (no system development <br />fee for irrigation due to reuse). <br />Project Name: <br />Koz 124 Unit Student Housing <br />Answer the Following Questions (Required): Ali Yellow Inputs <br />Water District: <br />Everett <br />Sewer District: <br />Everett I <br />Prepared By: Sabrina Fandler Date: <br />10/21/2019 <br />Outside City Limits? <br />INo *Adds a 25%Surcharge <br />Supportive Housing Credit? <br />INo ---d`Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Water & Sewer System Development <br />Fees: <br />Domestic Meter: <br />Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />"Subject to Administrative Guidelines <br />Proposed Building Use: <br />Motel/Hotel Previous Bldg Use #1: 1 Restaurant <br />Previous Bldg Use #2:1 Grocery <br />Previous Bldg Use #3:1 <br />No Other Use <br />ProposeclUnit Measure: <br />124 Room Unit Measure for Use #1: 110 Occupant Load <br />Unit Measure for Use #2: 1,176 Sq. Ft. <br />Unit Measure for Use #3: <br />None <br />Note: Administrative Guidelines <br />Proposed Meter Size: <br />2" Credited Meter #1 size: None <br />Credited Meter #2 Size: None <br />Credited Meter #3 Size: <br />None <br />Used for Calculation <br />Water Fee: <br />$154,364.86 Water Credit #1: $24,000.7P <br />Water Credit #2 $2,129.67 <br />Water Crec <br />$0.00 <br />Sewer Fee: <br />$199,773.17 Sewer Credit #1: $31,06C <br />Sewer Credit t $2,756.13 <br />`ewer Cred <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />Water Sys Dev Fee Total: <br />$128,234.40 <br />This fee reflects credit for existing water meter <br />Permit #: U <br />Sewer Sys Dev Fee Total: <br />$165,956.12 <br />This fee reflects credit for existing water meter <br />Total: <br />$294,190.52 <br />Irrigation Meter: <br />Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />1" Credited Meter Size: 1" <br />Water Fee: <br />$6,608.00 Water Credit: $6,608.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Permit #: U <br />No Sewer Sys Dev Fee: <br />$0.00 <br />Irrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: <br />Proposed Meter Size: <br />6" <br />For informational purposes only <br />Permit #: U <br />No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit #: 61804-011 <br />Type of Construction: New Construction/Redevelopment <br />Square Feet of New Plus Replaced Hard Surfaces: <br />22,910 SF <br />$5,697.97 A fee to the Building Permit <br />Stormwater System Dev Fee: <br />Ntfil <br />