Laserfiche WebLink
WATER NOTES <br />EVERETT DESIGN & CONSTRUCTION STANDARDS (2017) <br />A. NO CONNECTION TO THE EESTNG MAINS WILL BE ALLOWED <br />EXCEPT BY MEANS OF AN APPROVED BACIFLOW PREVENTION <br />DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, <br />DIBNFECTOI{ AND RECEIPT OF SATISFACTORY <br />BACTERIOLOGICAL TEST RESATS <br />B. CONNECTIONS TO .COD TAPS ON EXISTING MAINS WILL BE <br />MADE BY ME PUBUC WORKS DEPARTMENT AT THE <br />DEVELOPER'S EXPENSE ME PUBIC WORKS DEPARTMENT <br />SHALL BE OVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR <br />EACH CONNECTION. ME PUBUC WORKS DEPARTMENT SHALL <br />NEREAFTER DETERNINE ME DATE AND TIME AT WHICH ME <br />CONNECTION SHALL BE MADE. <br />C. ALL WDIM AND MATERIALS MUST CONFORM To CITY ON <br />EVERETT STANDARDS. <br />0. A PRE-CMSTRUCTION MEETING SHALL BE HELD WITH ME <br />CITY PRIM TO ME START OF OONSIRUCTION. ME CITY OF <br />EVERETT PUBUC WORKS CONSTRUCTION DIVISION MUST BE <br />NOTIFIED AT LEASE 24 HOURS PRIM TO COMMENCEMENT OF <br />CONsiRUCTIM. <br />E. THE DEVELOPER OR THE DEVELOPERS AUTHORIZED AGENT <br />SHALL NOTIFY ME PUBLIC WORKS DEPARTMENT OF A <br />PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS <br />DURING CONSTRUCTION ON A 21 HOUR BASS. <br />F. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 <br />INCHES VERTICAL SEPMADM BETWEEN POTABLE AND <br />NON POTABLE CONVEYANCE SYSTEMS <br />GALL CITY OF EVERETT VALVES SHALL BE OPERATED BY <br />PUBUC WORKS DEPARTMENT PERSONNEL ONLY. ALL VALVES, <br />NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL. OWES. <br />SEWER NOTES <br />EVERETT DESIGN & CONSTRUCTION STANDARDS (2017) <br />A. ALL WORK AND MATERIALS SHALL CONFORM TO ME CITY OF <br />EVERETT STANDARDS AND WSWT/APWA STANDARD <br />SPECIDCATIONS. <br />B. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE <br />COVERED. CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN <br />TESTED, INSPECTED, AND APPROVED BY THE CITY <br />INSPECTOR. <br />C.APPROXMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN <br />OBTAINED FROM AVALMLE RECORDS AND ARE SHOWN FOR <br />CONVENIENCE. THE CONTRACTOR SHALL IN RESPONSGUE <br />FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO <br />ANY ADDITIONAL UTILITIES NOT SHOWN. IF CONFLICTS WITH <br />EESTNG UPUTIES ARISE WRING CONSTRUCTION, ME <br />CONTRACTOR SHALL NOTIFY ME PUBLIC WORKS INSPECTOR <br />AND ANY ON DES REWIRED SHALL BE APPROVED BY ME <br />CITY EMORWER PRIM TO COMLENCEMENT OF RELATED <br />CONSMC71M ON ME PROJECT. <br />D. ALL SEWER MAIN EXTENSIONS WITHIN ME PUBLIC <br />RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY <br />SURVEY FOR LINE AND MADE PRIM TO STARTING <br />CONSTRUCTION. <br />SW 1/4, NW 1/4, SEC 17, T29N, R05E, W.M. <br />STORM DRAINAGE NOTES <br />EVERETT DESIGN & CONSTRUCTION STANDARDS (2017) <br />1. NO PART OF ME MANAGE SYSTEM SHALL BE COVERED. <br />CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN <br />INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF <br />EWRETT. <br />2. ALL WORK AND MATERIAL WALL CQFMM TO THE CITY OF <br />EVERETT DESCW AND CONSTRUCTION STANDARDS AND <br />SPECIFMATIONS AND THE MSDOT/APWA STANDARD <br />SPECIFICATIONS FOR ROAD. BRIDGE. ANO NU.CPAL <br />X. M,:14 <br />UTILITIES HAVE BEEN <br />AND ARE SHOWN FOR <br />STENCILED M <br />MANS TO <br />MTLAND.'CHOOSE <br />TESC NOTES <br />1. APPROVAL OF THIS EROSON/SEaMFHTATION CONTROL (ESC) PLAN GOES NOT <br />CONSTNTE AN APPROVAL OF PERMANENT ROAD OR MANAGE DESIGN (E.G. SZE <br />ANC, LOCATION OF ROADS, PIPES, RESTRICTOR% CHANNELS, RETENTION FACILITIES. <br />UTUTNS). <br />2. THE IMPLEMENTATION 6 THESE ESC PLANS AND ME CONSTRUCTOR, YANIENMCE, <br />REPLACEME)NT, AND UPGRADING OF THESE ESC FACILITIES 6 THE RESPONSIBILITY OF <br />THE APPUCANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND <br />APPROVED AND VEGETATION <br />/LANDSCMHG IS ESTABLISHED. <br />3. THE BOUNDARIES Di THE CIEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY <br />FLAGGED INTHE FIELD PRIM TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD. <br />NO DISMRBMCE BEYOND THE FLAGGED CLEARNG UNITS SHALL BE PERMITTED. THE <br />FLAGONo STALL BE MAINTAINED BY ME APPLICANT CONTRACTOR FOR THE <br />DURATION OF CONSTRUCTION. <br />4. THE ESC FACILTIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED INON CNHCTON <br />WITH ALL CLEARING AND GRADING ACTIVITIES. AND IN SUCH A MANNER AS TO <br />ENSURE THAT MONEMY AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE <br />SYSTEM. ROADWAYS, OR MWATE APPUCANE WATER WAUTY STANDARDS. <br />5. THE ESC FAONTIES SOW! ON THIS PLAN ARE ME MINIMUM REQUIREMENTS FOR <br />ANTICPATED SITE CONDITIONS WRING ME CONSTRUCTION PERIOD, THESE ESC <br />FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND <br />TO ENSURE NAT SEDIMENT AND SEDUIMT-LADEN WATER DO NOT LEAVE ME STE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY ME <br />APPUCANT/CONTRACTOR TO ENSURE THEIR CONTINUED FMCTONND. ESPECIALLY <br />AFTER STMM EVENTS <br />7. TE ESC FACUTIES ON NACTW BYES SHALL BE INSIPECTED AND MAINTAINED A <br />MINNUM OF MCE A MORN M WNN THE 18 HOURS FOLLOWING A MAIM STORM <br />EVENT. <br />6. AT NO TIME SHALL MORE THAN ME FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A CATCH BASIN INSERT. ALL CATCH BASINS AND CONVEYANCE <br />LINES SHALL BE CLEANED PRIM TO PAYING. ME CLEANING OPERATION WALL NOT <br />FLUSH SEDIMENT LADEN WATER INTO ME DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRICTION ENTRANCES SHALL BE INSTALLED AT ME BEGINNING OF <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF ME PROJECT. ADDITIONAL <br />MEASURES MAY BE REOUIKD TO ENSURE NAT ALL PAYED AREAS ME KEPT CLEAN <br />FOR ME DURATION OF ME PROJECT. <br />IG THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS <br />AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TMEN TO STOP SEXMENT FROM ENTERING <br />SURFACE WATER BODIES IF ME PROPOSED BMPS FAIL <br />12. BARE ANO/M DISTURBED SOILS WALL REMAIN UNCOVERED MD/OR UNSTABUZED <br />FOR NO MORE MAN DAYS FROM OCTOBER 1 THROUGH APRI 30. AND FOR NO <br />MORE THAN7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />RED BARN ENGINEERING IN( <br />6610 HE 181ST ST SITE 2 <br />KENMORE. WA WMS <br />PH. (206) 2CO-7174 <br />REDBARN-ENGINEERING.CON <br />811 <br />CALL BEFORE YOU D <br />r <br />Q <br />Q <br />O <br />DO <br />U)QN <br />EOf Bog <br />oa <br />�z ¢¢3 <br />m _ <br />U� UZr <br />ON wow <br />aG, <br />a� o� <br />U) <br />W <br />I— <br />O <br />z <br />SHEET NO, <br />C0.1 <br />