Laserfiche WebLink
Project: koz Development Surface Elevation: Approx.XX feet <br /> Job Number: 17-233 Top of Casing Elev.: N/A <br /> Location: 1020 Broadway Ave,Everett,Washington Drilling Method: Hollow Stem Auger <br /> Coordinates: Northing:,Easting: Sampling Method: SPT <br /> N-Value• <br /> d y <br /> H co PL Moisture LL <br /> a Q Q y E, MATERIAL DESCRIPTION I • <br /> 0 m O g RQD Recovery <br /> CO 0 _0 50 100 <br /> _Approximately 5"asphalt at surface. <br /> - - <br /> Medium dense,moist,brown,silty SAND with gravel(SM);rock in <br /> sampler tip(Fill). <br /> - 2 - <br /> 18 <br /> _ - S-1 X 36 >$* <br /> 50/6 <br /> - 4 - <br /> S-2 X <br /> 32 _?: upper <br /> dense,moist,gray silty SAND with gravel(SM);nge( hared in ��////l�l����� !l� <br /> 50/6 u er several feet of unit,occasional iron oxide staining Glacial Till- j�////� <br /> 6 Qvt). <br /> 8 S-3 Z 50/6 • Sample S-3:Increased gravel. f�f���•�f�f/f�f���f�f�f�f��f�f�f <br /> - 10- 39 ::. Sample S-4:Decreased gravel and silt-becomes sandy. %////////%,% / �'//r <br /> S 4 50/6 7/ii/�j�` <br /> Bottom of boring at 11 feet below ground surface. Groundwater was <br /> - - <br /> not observed at the time of drilling.Surface elevation estimated from <br /> - 12- ???. <br /> -14- - - - - - <br /> -16- <br /> - 18- <br /> 20 — <br /> Completion Depth: 11.0ft Remarks:Standard Penetration Test(SPT)sampler driven with a 140 lb.safety hammer. <br /> Date Borehole Started: 8/10/17 Hammer operated with a rope and cathead mechanism. <br /> Date Borehole Completed: 8/10/17 <br /> Logged By: NER <br /> Drilling Company: Boretecl,Inc. <br /> PanGE® LOG OF TEST BORING PG-2 <br /> INCORPORATED FigureA-3 <br /> The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 of 1 <br />