Laserfiche WebLink
EVERETT <br />WASHINGTON <br />PROJECT ADDRESS: <br />TENANT: <br />DESCRIPTION OF WORK: <br />PUBLIC WORKS REVIEW WORKSHEET <br />1819 RUCKER AVE <br />Permit #: C1904-017 <br />[TenName] <br />ADD UPPER STORY AND REMODEL MAIN FLOOR <br />Utility Permits (Note: Permit Technicians to Create Utility Permit for Sewer, Water, Fire,. and Irrigation, as selected below) <br />SANITARY SEWER: <br />❑ New Connection to main plus connections to building <br />❑ Alteration <br />❑ Repair <br />❑ Cap -off, quantity <br />❑ Reconnection to stub <br />❑ Backwater Valve <br />PLNOT REQUIRED <br />Explanation/ Utility Permit #: <br />IRRIGATION SERVICE: (Not Including Cost Estimates) <br />❑ New Connection, Size <br />❑ Meter Only, Size <br />❑ Water System Development Fee Total: $ <br />❑ Backflow Prevention (Outside Building): ❑ DCVA <br />V'UOT REQUIRED <br />Explanation/ Utility Permit #: <br />DOMESTIC WATER SERVICE: (Attach Calculation & Cost Est.) <br />❑ New Connection, Size - ❑ Per Cost Estimate <br />❑ Meter Only, Size - ❑ Per Cost Estimate <br />❑ Water System Development Fee Total: $ <br />❑ Sewer System Development Fee Total: $ <br />❑ Water Service Line (behind meter), Size <br />❑ Backflow Prevention (Outside Building): ❑ RPBA or ❑ DCVA <br />MOT REQUIRED <br />Explanation/ Utility Permit #: <br />FIRE SERVICE: (Attach Cost Estimate /Request for Reference) <br />❑ New Connection, Size - ❑ Per Cost Estimate <br />❑ %" Detect Meter Only, Service Size <br />❑ Backflow Prevention (Outside Building): ❑ DCDA <br />I -NOT REQUIRED <br />Explanation/ Utility Permit #: <br />WATER DEPARTMENT COST ESTIMATE NEEDED-(/f yes, PW Reviewer to send cost estimate request to Water Department) <br />❑ Yes, Quantity See attached for reference. <br />1*NOT REQUIRED <br />Plumbing Permits (Note: Permit Technicians to add all items selected below to Plumbing Permit -for items inside building only) <br />❑ Backflow Prevention (Inside Building): ❑ DCVA (for Domestic service) ❑ RPBA (for Domestic service) ❑ DCDA (for Fire service) <br />ffi-RIOT REQUIRED <br />Building Permits (Note: Permit Technicians to add all items selected below to associated Building Permit) <br />STORMWATER SYSTEM DEVELOPMENT FEES: TRAFFIC MITIGATION FEES: <br />,YES, Stormwater Total: $ $" 1.O S' ❑ YES, Traffic Mitigation Total: $ <br />❑ Roof Only Fee on Bldg Permit (ground hard surfaces fee on PW Permit) ❑ See Attached for calculations / credit <br />).All Hard Surface Fees to be added to Permit # C.19 b 4 - p i-7 P, WOT REQUIRED <br />JESee Attached Spreadsheet for calculations / credit <br />❑ NOT REQUIRED <br />Additional Checklists: <br />ADDRESS LETTER REQUIRED? (If yes (new assigned address), printout Address Letter from TRAKiT Print Menu and include) <br />❑ YES — TYPE: ❑ SFR ❑ DUPLEX ❑ ADU ❑ INFILL DWELLING ❑ MULTI -FAMILY ❑ COMMERCIAL <br />❑ See Attached Letter, 2 copies (Permit Techs to issue one copy to applicant with permits, scan one copy to Jeffrey Marks) <br />❑ Digital copy attached to permit record, Permit # <br />❑ Saved to Address Folder in Development Tech File <br />,NOT REQUIRED <br />FIRE SPRINKLERS REQUIRED? <br />❑ YES —Type <br />KNOT REQUIRED <br />PUBLIC WORKS PERMIT REQUIRED? <br />❑ YES, Permit # PW' <br />❑ Stormwater NPDES Tab Completed in TRAKiT ❑ ADA Tab Completed in TRAKiT ❑ Inspections Added in TRAKiT <br />ONOT REQUIRED <br />Worksheet Completed By: Date: S Z61 9 <br />Worksheet Checked By: Date: <br />REVISED 4/24/2019 <br />