Laserfiche WebLink
PUB c tiORKS PERMiT--4111Date Applied:7/30/2018 - — - <br /> Public Works Permit#: PW1807-045 <br /> 0101' -City,of-Everett-Permit Services,, .: -- — ==r_ __ _ _,:_._.,... <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: C1807-013 <br /> Everett,WA 98201 Planning Reference#: <br /> 401471g41.7 <br /> (425) 257-8810 Public Works Fee: $185.00 <br /> 1 JUL 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ANIGILAJE OLUWAROTIMI &OLAJUMOKE ANIGILAJE OLUWAROTIMI &OLAJUMOKE <br /> 2319 COLUMBIA AVE __ . - 2319 COLUMBIA AVE-_ _------ ------------ -_- -_ <br /> EVERETT, WA, 98203-5352 EVERETT, WA, 98203-5352 <br /> PHONE: PHONE: <br /> =TAX PARCEL-1D# 00545001602300 SITE ADDRESS: 2307 LUMBIAAVE <br /> DESCRIPTION: NEW SFR TO INCLUDE AN AFH <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 02/05/2019. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to <br /> formally request all required inspections. Flyers are provided at permit issuance with instructions on how to request an <br /> inspection online. <br /> -6 -Install-and maintain erosion control measures per-City of Everett-Standards-and-approved-SWRP-P-/Plan-R iove°, n -- <br /> completion of the project prior to final approval of the permit. 1-• H-•�— t-•�-.�-•,- ;°�G"' <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tra ediQ3t rwc_r .=, ° <br /> 8. Protect all existing underground utilities during construction. g <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff fresrfi na/replay eill' iRiEburVes will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the ity's right-ovay and/or <br /> easements and the improvements located therein. rri <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspfspton <br /> online by selecting PW 22-Site Final within the Online Permitting Portal Inspectid Requests for this permit when all iteAs <br /> have been completed. f' <br /> 11. All work constructed within the public right-of-way must be removed or reloced _t the owner's expense if the City +ver <br /> requires use of the right-of-way for municipal purposes. e ; a' ;r2.2 r; ° <br /> G71{ Ca f•J-^7' G L.F1 L.r1 LSI <br /> Public Works Permit Fee Breakdown: r,r.., <br /> Erosion Control $50.00 —4 <br /> Paving (1021SF) $45.00 <br /> Driveway/Asphalt Apron $25.00 _ <br /> Misc. Minor Permits (Drainage Work) $25.00 <br /> PW Plan Review....... ......... ......... .........$20.00. <br /> PW Site Inspection . . $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> —harmless the City-of Everett-from any and-afl cfaims-for damages,costs, <br /> 2 9 expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> 1 <br /> FINAL INSPECTION Date �� ii 7I <br /> Approved as Constructed (PW Inspector) Signatur- of •pplicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> '�1 — - C.c?Y <br />