My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8525 EVERGREEN WAY BURGER KING 2021-05-10
>
Address Records
>
EVERGREEN WAY
>
8525
>
BURGER KING
>
8525 EVERGREEN WAY BURGER KING 2021-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 11:25:55 AM
Creation date
5/4/2021 10:41:28 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8525
Tenant Name
BURGER KING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element#8—Stabilize Channels and Outlets <br /> N/A <br /> Element#9—Control Pollutants <br /> BMPs C151, C152, C153, and C154 will be used to control pollutants. All <br /> pollutants, including waste materials and demolition debris, that occur onsite shall <br /> be handled and disposed of in a manner that does not cause contamination of <br /> stormwater. Good housekeeping and preventative measures will be taken to ensure <br /> that the site will be kept clean, well-organized, and free of debris. <br /> Element#10—Control Dewatering <br /> There will be no dewatering expected as part of this proposal. If it occurs, Baker tanks will <br /> be used for dewatering. <br /> Element#11 —Maintain BMPs <br /> BMPs C150 and C160 will be used. Materials will be kept on hand to maintain permit <br /> compliance. All temporary and permanent erosion and sediment control BMPs shall be <br /> maintained and repaired as needed to assure continued performance of their intended <br /> function. Maintenance and repair shall be conducted in accordance with each particular <br /> BMP's specifications. Visual monitoring of the BMPs will be conducted at least once every <br /> calendar week and within 24 hours of any rainfall event that causes a discharge from the <br /> site. If the site becomes inactive, and is temporarily stabilized, the inspection frequency <br /> will be reduced to once every month. All temporary erosion and sediment control BMPs <br /> shall be removed within 30 days after the final site stabilization is achieved or after the <br /> temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized <br /> on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently <br /> stabilized. <br /> Element#12—Manage the Project <br /> BMPs C150, C160, and C162 shall be used to manage the project. <br /> Erosion and sediment control BMPs for this project have been designed based on the <br /> following principles: Design the project to fit the existing topography, soils, and drainage <br /> patterns; Emphasize erosion control rather than sediment control; Minimize the extent and <br /> duration of the area exposed; Keep runoff velocities low; Retain sediment on site; <br /> Thoroughly monitor site and maintain all ESC measures and Schedule major earthwork <br /> during the dry season. The SWPPP shall be modified as necessary to include additional or <br /> modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be <br /> completed within seven(7) days following the inspection. <br /> Element#13—Protect On-site Stormwater Management BMPs for Runoff from Roofs <br /> and Other Hard Surfaces <br /> BMPs C103 and C233 will be used. On-site stormwater management BMPs used for runoff <br /> from roofs and other hard surfaces include: full dispersion, roof downspout full infiltration <br /> Insight Engineering Co. - Stormwater Site Plan 12/20/2018 <br /> -22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.