Element#8—Stabilize Channels and Outlets <br /> N/A <br /> Element#9—Control Pollutants <br /> BMPs C151, C152, C153, and C154 will be used to control pollutants. All <br /> pollutants, including waste materials and demolition debris, that occur onsite shall <br /> be handled and disposed of in a manner that does not cause contamination of <br /> stormwater. Good housekeeping and preventative measures will be taken to ensure <br /> that the site will be kept clean, well-organized, and free of debris. <br /> Element#10—Control Dewatering <br /> There will be no dewatering expected as part of this proposal. If it occurs, Baker tanks will <br /> be used for dewatering. <br /> Element#11 —Maintain BMPs <br /> BMPs C150 and C160 will be used. Materials will be kept on hand to maintain permit <br /> compliance. All temporary and permanent erosion and sediment control BMPs shall be <br /> maintained and repaired as needed to assure continued performance of their intended <br /> function. Maintenance and repair shall be conducted in accordance with each particular <br /> BMP's specifications. Visual monitoring of the BMPs will be conducted at least once every <br /> calendar week and within 24 hours of any rainfall event that causes a discharge from the <br /> site. If the site becomes inactive, and is temporarily stabilized, the inspection frequency <br /> will be reduced to once every month. All temporary erosion and sediment control BMPs <br /> shall be removed within 30 days after the final site stabilization is achieved or after the <br /> temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized <br /> on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently <br /> stabilized. <br /> Element#12—Manage the Project <br /> BMPs C150, C160, and C162 shall be used to manage the project. <br /> Erosion and sediment control BMPs for this project have been designed based on the <br /> following principles: Design the project to fit the existing topography, soils, and drainage <br /> patterns; Emphasize erosion control rather than sediment control; Minimize the extent and <br /> duration of the area exposed; Keep runoff velocities low; Retain sediment on site; <br /> Thoroughly monitor site and maintain all ESC measures and Schedule major earthwork <br /> during the dry season. The SWPPP shall be modified as necessary to include additional or <br /> modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be <br /> completed within seven(7) days following the inspection. <br /> Element#13—Protect On-site Stormwater Management BMPs for Runoff from Roofs <br /> and Other Hard Surfaces <br /> BMPs C103 and C233 will be used. On-site stormwater management BMPs used for runoff <br /> from roofs and other hard surfaces include: full dispersion, roof downspout full infiltration <br /> Insight Engineering Co. - Stormwater Site Plan 12/20/2018 <br /> -22- <br />