Laserfiche WebLink
o In the legend(or a table on this sheet), provide areas (in acres) of paving to be <br /> removed, new hard surface, and replaced hard surface,broken down by on-site <br /> versus right-of-way area and also by TDA. <br /> A legend has been provided as specified above. See sheet C3.1. <br /> • Bioretention Area Basin Plan: <br /> o In the legend(or a table on this sheet)provide areas (in acres) of asphalt <br /> pavement, concrete, landscaping, and bioretention,broken down by on-site versus <br /> right-of-way area and also by TDA. <br /> Bioretention is no longer proposed. <br /> Please feel free to contact me with any questions or comments you may have. <br /> Sincerely, vff(A, <br /> Santhosh Moolayil, <br /> Project Manager <br /> PO Box 1478 • Everett, WA 98206 • Phone: (425) 303-9363 <br /> Fax: (425) 303-9362 • Email:info@insightengineering.net <br />