My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8525 EVERGREEN WAY BURGER KING 2021-05-10
>
Address Records
>
EVERGREEN WAY
>
8525
>
BURGER KING
>
8525 EVERGREEN WAY BURGER KING 2021-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 11:25:55 AM
Creation date
5/4/2021 10:41:28 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8525
Tenant Name
BURGER KING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
€N5IG T k /NEER1NG CO. <br /> December 20, 2018 <br /> Thad Newport <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> (425)257-8867 <br /> Re: Burger King—PW1709-047 <br /> IECO No. 18-0961 <br /> Dear Thad, <br /> The project referenced above is revised in response to the review comments dated December 5, <br /> 2018. The review comments are numbered on the letter and have been addressed in italics as <br /> follows: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your <br /> plans accordingly,prior to resubmitting to the Permit Services Counter. If you have any <br /> questions regarding the comments/redlines or need anything further,please directly <br /> contact this project's Public Works plans reviewer, Thad Newport, or the other reviewers <br /> listed depending on the scope of the question. Please note that these comments are <br /> compiled from Public Works (civil)plans only. The applicant team may receive a <br /> separate comment letter from the Building Department and/or the Planning Department <br /> for architectural or other types of drawings. <br /> a. Please resubmit the following items to the Permit Services Counter with your <br /> resubmittal once all requested revisions have been made: <br /> i. Transmittal (1) available at the Permit Counter(and included herein for <br /> your use upon resubmittal). <br /> ii. Plans: (4) full size sets of revised plans, plus original City Markups. <br /> iii. Drainage Report: (2) copies of revised report. <br /> iv. SWPPP Report: (2)copies of revised SWPPP. <br /> v. Easement Form: (1)copy of easement form for pedestrian easement with <br /> legal description and exhibit attached for review. Signing of this form <br /> must be notarized and can take place at the permit counter if needed, <br /> typically done at the time of permit issuance for convenience to the owner. <br /> vi. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate <br /> form filled out for the City of use to calculate the Public Works Permit Fee <br /> (as applicable based on water plan revision). <br /> PO Box 1478 • Everett, WA 98206 • Phone: (425) 303-9363 <br /> Fax: (425) 303-9362 • Email:info@insightengineering.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.