My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8525 EVERGREEN WAY BURGER KING 2021-05-10
>
Address Records
>
EVERGREEN WAY
>
8525
>
BURGER KING
>
8525 EVERGREEN WAY BURGER KING 2021-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 11:25:55 AM
Creation date
5/4/2021 10:41:28 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8525
Tenant Name
BURGER KING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIANORKS PERMIT • Date Applied: 9/26/2017 <br /> City of Everett Permit Services Public Works Permit#: PW1709-047 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B1709-039 <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $1140.05 <br /> 02 MAY 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> QUINTANA ANTHONY M & DEBORAH G STAVERT JEFF <br /> PO BOX 23152 <br /> FEDERAL WAY, WA, 98093 , , <br /> PHONE: PHONE: 4252522153 <br /> TAX PARCEL ID#: 28041300103900 SITE ADDRESS: 8525 EVERGREEN WAY <br /> DESCRIPTION: CONSTRUCT NEW BURGER KING <br /> THIS WORK COVERS SITE DEVELOPMENT SUCH AS PAVING, UTILITY HOOK UPS AND STREET IMPROVEMENTS. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department dated <br /> 02/15/2019.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request <br /> all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall <br /> be scheduled 3-4 weeks in advance. <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 8. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior <br /> to final approval/close out of the permit. <br /> 9.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 10. Stormwater covenant to be recorded before final approval. <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Schedule the existing <br /> Planning Landscape inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of ccupancy. Request a final inspection online by <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests whe. items have been completed for this permit. <br /> ZMPublic Works Permit Fee Breakdown: A 1 <br /> Driveway/Concrete Apron(2) $90.00 <br /> Paving (12,381SF) $61.91 2 2kyt <br /> Erosion Control $200.00 MAy APR 2 6 2019 ,91 <br /> Grade/Fill/Excavate(100CY) $50.00 SETT <br /> PW Plan Review $246.05 �F EVE <br /> PW Site Inspection $492.09 CITYery`ces CITY OF EVERETT <br /> perm S Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> /`3/�,� expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> ep1ace p lic property clam.!-. -. . J <br /> FINAL INSPECTION Date <br /> 26t <br /> Approved as Constructed (PW Inspector) Si ature of ApP cant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> 1 FILE ca?Id <br />
The URL can be used to link to this page
Your browser does not support the video tag.