Laserfiche WebLink
Figure 1- Minimum Requirements (MR's) for Redevelopment Projects <br /> I _ <br /> Does the proiect resuit in 2,000 square feet or more,of new plus replaced hard surface area? <br /> OR <br /> ' Does the land disturbing activity total 7,000 square feet tx greater? <br /> Yes No <br /> Minimum Requirements al through rit ; "" <br /> apply to the new and replaced hard ' 1 Minimum Requirement#2 applies. <br /> surfaces and the land disturbed. <br /> i Next Question <br /> Does the protect acid 5,000 square feet or more of new hard surfaces!,-,1 <br /> OR <br /> i <br /> Convert Y4 acres or more of vegetation to lawn or landscaped arms? <br /> OR <br /> Convert 2 5 acres Of more of native vegetation to pasture') <br /> ' <br /> , Yes I No <br /> • r--- — <br /> I Minimum Requirements apply Next Question 1 is this a road <br /> to the new hard surfaces and the * <br /> related project? <br /> +Yes <br /> I : <br /> i <br /> Does the prolect add 5.000 squarefeet or more of new hard surfaces? <br /> L <br /> T „.„--J <br /> r <br /> es <br /> v I No <br /> is me total of new plus replaced hard surfaces <br /> :I Do thc new hard <br /> , ------4---- 5,000 square feet or more. <br /> -1 surfaces add 50'S. ‘or No ii No additional I NO AND <br /> 1 mcfe to the existing requi----- ii .rements — does the value of the proposed improvements 1! <br /> , ., <br /> 1 hard surfaces within -including interior improvements-exceeo 1 <br /> the project;Units? _ <br /> 50%of the assessed value or rediaternem <br /> value)of the existing site improvements? 1 <br /> ' <br /> Yes"\... All Minimum Requirements apply to the new and replaced " <br /> i.. i hard surfaces and converted vegetation areas, Yes , <br /> Figure 1-2,42 <br /> Row Chart for Determining Requirements for <br /> , 161 Redevelopment <br /> 1 DEPARTMENT OF Revseo Jur*2015 <br /> ECOLOGY Please st,e htta.1/wonv ecywagov4copyriglit Om,foe'copyrigN nr::,::,',iv.,CH 19 peimiattioris <br /> $tate ai ‘fi, :,:r,,g.:ciri fitnItabor r!t.;&:Ii,,: wr.i LI'1,:.:1 '-,r' <br /> Basin "A" Basin "B" <br /> emenemm.010.. issinessensuoili. <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -6- <br />