Laserfiche WebLink
The proposed new and replaced hard surface areas are: <br /> Basin A <br /> Onsite <br /> New Hard Surface = 0.01 acres ( 480 SF) <br /> Replaced Hard Surface =0.17 acres (7,470 SF) <br /> Total New+Replaced Hard Surface =0.18 acres (7,950 SF) <br /> Frontage <br /> New Hard Surface = 0.01 acres ( 550 SF) <br /> Replaced Hard Surface = 0.02 acres ( 703 SF) <br /> Total New+Replaced Hard Surface = 0.03 acres (1,253 SF) <br /> The Total New + Replaced Hard Surface Basin A is 9,203 SF <br /> Basin A does not contain any converted vegetated area. <br /> Basin B <br /> Onsite <br /> New Hard Surface = 0.01 acres ( 200 SF) <br /> Replaced Hard Surface = 0.06 acres (2,548 SF) <br /> Total New+Replaced Hard Surface = 0.07 acres (2,748 SF) <br /> Frontage <br /> New Hard Surface = 0.00 acres ( 0 SF) <br /> Replaced Hard Surface = 0.01 acres (530 SF) <br /> Total New+Replaced Hard Surface = 0.01 acres (530 SF) <br /> The Total New + Replaced Hard Surface Basin B is 3,278 SF <br /> Basin B does not contain any converted vegetated area. <br /> Please refer to the New & Replaced Hard Surface Map at the end of this section for a visual <br /> representation of the areas. <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> - 16- <br />