Laserfiche WebLink
2/13/202q City of Everett <br />page 4/S <br />1, :34-01PM <br />INSPECTION ACTIVITY REPORT <br />11/4/2019 11/4/2019 ELEC 06-ROUGH SKB PARTIAL APPR <br />eTRAKiT Inspection <br />10/30/2019 1:11 PM David Potts <br />IN <br />Request <br />Hard lid and Wall cover C sector <br />Contact Name: Uriah Chandler <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2087550054 <br />e-Mail: dave.potts@veca.com <br />(Canceled - eTRAKiT - 10/31/2019 1:22:04 <br />PM) <br />(11/4/2019 11:28 AM SKB) <br />Walls in hardwoods sector C except patient <br />for except flex patient excluding flex <br />patient rooms. Had conversation with <br />contractor and facilities about competency <br />test of the critical branch to be shown to <br />Curtis Brown Fire Marshall and/or Tony <br />Lee head building official, they want to <br />propose alternate means and methods. <br />11/8/2019 11/8/2019 ELEC 06-ROUGH SKB APPROVAL <br />eTRAKiT Inspection <br />11/6/2019 11:26 AM David Potts <br />IN <br />Request <br />The remaining (4) flex patient rooms <br />Contact Name: Uriah Chandler <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2087550054 <br />e-Mail: dave.potts@veca.com <br />11/8/2019 11/8/2019 ELEC 05-SERVICE SKB APPROVAL <br />eTRAKiT Inspection <br />11/6/2019 12:48 PM David Potts <br />Request <br />Feeder inspection on the added branch <br />panels. <br />Contact Name: Uriah Chandler <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2087550054 <br />e-Mail: dave.potts@veca.com <br />'(11/8/2019 9:27 AM SKB) <br />Feeders <br />11/20/2019 11/20/2019 ELEC 09-FINAL SKB PARTIAL APPR <br />eTRAKiT Inspection <br />11/19/2019 2:08 PM David Potts <br />Request <br />Phase 1 complete <br />Contact Name: David Potts <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2064620925 <br />e-Mail: dave.potts@veca.com <br />(11/20/2019 2:56 PM SKB) <br />Letter dated November 12, 2019 from <br />Electrical Engineer of record accepted and <br />entered into the perminanct file as evidence <br />of compentecy of the legally required <br />standby system etc. Phase 1 complete. <br />12/17/2019 12/17/2019 ELEC 07-TGRID SKB APPROVAL <br />eTRAKiT Inspection <br />12/16/2019 8:54 AM David Potts <br />Request <br />F sector cover. Can do C sector time <br />permitting <br />Contact Name: David Potts <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2064620925 <br />e-Mail: dave.potts@veca.com <br />(12/17/2019 10:24 AM SKB) <br />Phase 2 complete. <br />2/4/2020 2/4/2020 ELEC 09-FINAL SKB PARTIAL APPR <br />eTRAKiT Inspection <br />2/3/2020 1:13 PM David Potts <br />Request <br />F Sector final <br />Contact Name: David Potts <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2064620925 <br />e-Mail`. dave.potts@veca.com <br />(2/4/2020 11:46 AM SKB) <br />F Sector northside partial final <br />INSP12 <br />