My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1913 HOYT AVE WHOLE SITE 2022-05-23
>
Address Records
>
HOYT AVE
>
1913
>
WHOLE SITE
>
1913 HOYT AVE WHOLE SITE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:57:47 AM
Creation date
5/4/2021 2:11:26 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1913
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ' 1 <br /> y . Stormwater Management Questionnaire For <br /> Single Family Residential / Duplex / Small Projects <br /> Step 1: Fill in the Quantities below: <br /> The total amount ofproposed hard surfaces(rooftop, etc.)for1 4,368 <br /> pavement, my project site is: S.F. (Box 1) <br /> The amount of existing hard surfaces on my project site that will be removed or replaced is: I 440 S.F. (Box 2) <br /> The amount of net new hard surfaces on my site(proposed minus existing to be removed/replaced)is: 13,968 S.F. (Box 3) <br /> Step 2: Evaluate the three statements below by selecting TRUE or FALSE: <br /> 1. The value of Box 2+Box 3= Box 1, above. <br /> Reserved for City of Everett Public Works Approval Stamp <br /> ANSWER: True <br /> *If False,re-evaluate your areas and try again. <br /> yPROVED <br /> 2. The value in Box 1 above is 2,000 square feet or more. PUB ORKS D R MENT <br /> ANSWER: True g �_ <br /> *If False,only complete General Information&Construction Stormwater Plan. / „'J / <br /> D E �vJ/ )J <br /> 3. The value in Box 3 above is less than 5,000 square feet. CITY OF EVERET tEVIE D FOR FERMI <br /> ANSWER:True FL <br /> 1 M 10 - )49 <br /> *If False,submit an Engineered Drainage Report addressing MR#1-9. j �/�J _I <br /> Step 3: Proceed with this entire Questionnaire if all 3 answers above are TRUE. <br /> General Information: <br /> Project Site Address: 1913 Hoyt Ave Everett, WA 98201-2237 <br /> Prepared By: Insight Engineering <br /> Date Prepared: 9-14-2018 <br /> Existing Site Information: <br /> 1. Please describe the existing structures, hard surfaces,slopes, drainage patterns,drainage <br /> pipes,vegetation, etc. <br /> The existing site contains a concrete slab and residential landscaping. The site is relatively flat. <br /> The existing runoff sheet flows off the site. <br /> 2. Please provide the following quantities of existing hard surfaces in square feet: <br /> Existing Roof Area: N/A <br /> Existing Other Hard Surfaces (pavement,gravel, etc.): 440 SF <br /> 3. Which direction does the site currently slope? (Towards a street,towards an alley, <br /> towards a neighboring property,etc.) <br /> The western half of the site slopes gently towards Hoyt Ave while the east half slopes towards the alley. <br /> 4. What currently happens to rainwater that falls on the site? <br /> Rainwater sheet flows off of the site to Hoyt Ave and the alley. <br /> 5. Please describe any critical areas on the site (wetlands,buffers,steep slopes, etc.)This <br /> information can be obtained from the City's GIS data, and is available at the permit _. <br /> ' Page 1 of 6 <br /> CITY OF EVERETT 13200 Cedar Street I Everett, WA 98201 1425-257-8810 I everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.