My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1913 HOYT AVE WHOLE SITE 2022-05-23
>
Address Records
>
HOYT AVE
>
1913
>
WHOLE SITE
>
1913 HOYT AVE WHOLE SITE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:57:47 AM
Creation date
5/4/2021 2:11:26 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1913
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 • • <br /> r <br /> j <br /> Construction Stormwater Plan: <br /> All new development and redevelopment projects are responsible for preventing erosion and <br /> sedimentation during construction. Each of the 13 requirements below contains a list of BMPs that are <br /> accepted by the Department of Ecology for satisfying each requirement. (For more information on each <br /> BMP,please go to Chapter 4 in Volume II of Ecology's Stormwater Management Manual for Western <br /> Washington:https://fortress.wa.gov/ecv/publications/parts/1410055part4.pdf). <br /> Please select all BMPs that you will be using to satisfy each requirement,and where applicable,show <br /> these items on a map of your project.All requirements must have at least one item selected: <br /> 1. Preserve Vegetation/Mark Clearing Limits: <br /> ❑BMP C101: Preserving Natural Vegetation <br /> ❑BMP C102: Buffer Zones <br /> Ed B M P C103: High Visibility Plastic or Metal Fence <br /> 2. Establish Construction Access: <br /> VIBMP C105:Stabilized Construction Entrance/Exit <br /> ❑BMP C106:Wheel Wash <br /> ❑BMP C107:Construction Road/Parking Area Stabilization <br /> 3. Control Flow Rates: <br /> ❑BMP C203:Water Bars <br /> ❑BMP C240:Sediment Trap <br /> ❑BMP C241:Temporary Sediment Pond <br /> Not Applicable To My Proposed Project <br /> 4. Install Sediment Controls: <br /> ❑BMP C231: Brush Barrier <br /> ❑BMP C232:Gravel Filter Berm <br /> VTBMP C233:Silt Fence <br /> O BMP C234:Vegetated Strip <br /> -ZBMP C235:Wattles <br /> ❑BMP C240:Sediment Trap <br /> ❑BMP C241:Temporary Sediment Pond <br /> 5. Stabilize Soils: <br /> ❑BMP C120:Temporary and Permanent Seeding <br /> EZBMP C121: Mulching <br /> ❑BMP C122: Nets and Blankets <br /> 1,L1BMP C123:Plastic Covering <br /> ❑BMP C124:Sodding <br /> ❑BMP C125:Topsoiling/Composing <br /> ❑BMP C126:Polyacrylamide for Soil Erosion Protection <br /> ❑BMP C130:Surface Roughening <br /> ❑BMP C131:Gradient Terraces <br /> BMP C140: Dust Control <br /> •age 5 of 6 <br /> CITY OF EVERETT 13200 Cedar Street ( Everett,WA 98201 1425-257-8810 l everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.