Laserfiche WebLink
Work Activity Work Order <br />Page 2 <br />4/1/2021 13:46 <br />Issued By BRP BIGLEY, RYAN P. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 1/14/2021 <br />Fund 401 Accounts Program Function Activity <br />Program UT3473 21 3 <br />Title CONVERT .75 INCH 808 105TH PL SE UT3473-21-3 <br />Work Order No 20210309 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 1/14/2021 Time 08:22 Original WO Billing <br />Completed By <br />Problem Details <br />Time <br />Follow Up? <br />CONVERT .75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br />BOX. FLAT TO METER PROJECT. <br />Structure ID StrTyp Activi Compl Date Comments <br />WS1985LO34 WASRVC YES 2/10/2021 <br />Address 808 105TH PL SE <br />Cross Street <br />Area Designator Structure Location <br />Map Reference 105TH PL SE - 808 <br />Location <br />Material Costs Billing <br />Type Mater No Description Quantity Cost Date War <br />M <br />ADAP34000647 <br />ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE <br />1 <br />17.321 <br />02/11/2021 <br />PAP <br />M <br />ADAP34145347 <br />ADAPTER 3/4 MIP X 1 IPS INSTA-TITE <br />1 <br />29.641 <br />02/11/2021 <br />PAP <br />M <br />ADAP34000547 <br />ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE <br />3 <br />52.914 <br />02/11/2021 <br />PAP <br />M <br />BOX000154347 <br />BOX METER MOLDED PLASTIC W/DI LID 11" X 18" (SMALL) <br />1 <br />77.161 <br />02/11/2021 <br />PAP <br />M <br />ELL034104247 <br />ELBOW 3/4 NPT 90 DEG STREET BRASS (1/4 BEND) <br />2 <br />8.482 <br />02/11/2021 <br />PAP <br />M <br />METE34141847 <br />METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA <br />1 <br />211.398 <br />02/11/2021 <br />PAP <br />M <br />PIPE34060647 <br />PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 <br />3 <br />.972 <br />02/11/2021 <br />PAP <br />M <br />SETT34149747 <br />SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VINO <br />1 <br />110.581 <br />02/11/2021 <br />PAP <br />Total Material Cost <br />$508.46 <br />NA Costs <br />Type <br />Na No <br />Description <br />Quantity <br />Cost <br />Billing Date <br />War <br />NA <br />N/A <br />3/4 MINUS ROCK <br />.25 <br />6.405 <br />02/11/2021 <br />NA <br />N/A <br />TOPSOIL <br />.13 <br />3.851 <br />02/11/2021 <br />NA <br />N/A <br />TRACING WIRE <br />3 <br />.6 <br />02/11/2021 <br />NA <br />N/A <br />WIRE CLAMP <br />1 <br />1.62 <br />02/11/2021 <br />Total NA Cost $12.48 <br />Total Cost $520.94 <br />2►3 <br />