Laserfiche WebLink
0 <br />PRIVATE WORK <br />Item <br />Unit <br />Quantity <br />Unit Price Amount <br />Storm Sewers <br />4 - 6 Inch Pipe <br />L.F. <br />1,650 <br />20.00 <br />$33,000 <br />8 Inch Pipe <br />L.F. <br />25.00 <br />12 Inch Pipe <br />L.F. <br />886 <br />35.00 <br />$31,010 <br />Yard Basin <br />Ea. <br />2 <br />200.00 <br />$400 <br />Standard Catch Basin <br />Ea. <br />8 <br />700.00 <br />$5,600 <br />Extra Depth Excavation, <br />Over 12' deep) <br />Ft./L.F. <br />5.00 <br />48 Inch MH/CB Type II <br />Ea. <br />4 <br />1,800.00 <br />$7,200 <br />54 Inch MH/CB Type II <br />Ea. <br />2,700.00 <br />Extra Depth MH/CB, <br />48 inch per ft. over 12' <br />Ft. <br />110.00 <br />Extra Depth MH/CB, <br />54 inch per ft. over 12' <br />Ft. <br />140.00 <br />Restrictor/Pollution Control, <br />12 Inch Large) <br />Ea. <br />2 <br />1,000.00 <br />$2,000 <br />Storm Water-Vauk- System <br />Ea. <br />1 <br />$85,000 <br />$85,000 <br />Water Quality Vault <br />Ea. <br />Other 18 inch pipe <br />LF. <br />275 <br />40 <br />$11,000 <br />Storm Sewers Total: $ $207,210 <br />72 inch MH/CB Type II EA <br />COST EST FEE CALC - 2018 <br />5,400 $32,400 <br />