Laserfiche WebLink
2019 System Development Fee Calculations <br />Permit#• <br />PW1809-014 <br />Additional Notes: <br />Project Address: <br />1622 E Marine view Dr <br />Water and Sewer System Development Fees to be added to Utility Permit for Sewer connections since it is one condensed permit for the entire site. <br />Project Name: <br />Riverview Apartments (203 Unit Multi -Family) <br />Stormwater System Development Fees will be added to the Public Works permit for all hard surfaces on the ground and to each building permit for the associated <br />roof areas. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: <br />Everett <br />Sewer District: <br />Everett <br />Prepared By: Sabrina Fandler Date: 6/19/2019 <br />Outside City Limits? <br />INo *Adds a 25%Surcharge <br />Supportive Housing Credit? <br />INo *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Water & Sewer System Development <br />Fees: <br />Domestic Meter: <br />Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />-Subject to Administrative Guidelines <br />Proposed Building Use: Muiltifamily unit Previous Bldg Use #1: SFR/Townhome Previous Bldg Use #2: SFR/Townhome <br />Previous Bldg Use #3: <br />SFR/Townhome <br />ProposedUnit Measure: <br />203 unit Unit Measure for Use #1: 1 Unit Unit Measure for Use #2: 1 Unit <br />Unit Measure for Use 13: <br />1 Unit <br />Note: Administrative Guidelines <br />Proposed Meter Size: <br />2" Credited Meter #1 Size: 3/4" Credited Meter #2 Size: 3/4" <br />Credited Meter #3 Size: <br />3/4" <br />Used for Calculation <br />Water Fee: <br />$361,471.95 Water Credit #1: $3,957.00 Water Credit #2: $3,957.00 <br />Water Crec <br />$3,957.00 <br />Sewer Fee: <br />$467,803.35 Sewer Credit #1: $5,121.00 Sewer Credit #2: $5,121.C' <br />ewer Cred <br />$5,121.00 <br />Total Fees Due. Add to Utility Permit for Domestic Meter <br />�t n <br />Permit #: U d ` �D 3a <br />Water Sys Dev Fee Total: <br />$349,600.95 <br />This fee reflects credit for existing water meter <br />*Add to Sewer Utility Permit <br />Sewer Sys Dev Fee Total: <br />$452,440.35 <br />This fee reflects credit for existing water meter <br />Total: <br />$802,041.30 <br />Irrigation Meter: <br />Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />Credited Meter Size: <br />Water Fee: <br />#N/A Water Credit: <br />No Sewer Fee: <br />$0.00 No Sewer Credit: 50.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U <br />Water Sys Dev Fee Total: <br />#N/A <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />Irrigation meters are only subject to the water portion of system development fees <br />Total: 4N/A <br />Fire Meter: <br />Proposed Meter Size: <br />None <br />For informational purposes only <br />Permit #: U <br />No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit <br />Type of Construction: <br />Square Feet of <br />New Plus Replaced Hard Surfaces: <br />SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />