Laserfiche WebLink
Ea.rth Solutions NWLLC <br />1 15365 NE 901h Street, Suite 100 <br />Redmond, WA 98052 <br />Main (425) 449-4704 1 Fax (425) 449-4711 <br />qNFEwww.esnw,com <br />ESNW Rep. <br />Project No. <br />Page <br />Report No, <br />EMH <br />4938.10 <br />2 of 2 <br />99C' <br />Time On Site <br />Time Off Site <br />Date <br />Day of Week <br />8:15 AM <br />9:15 AM <br />12/30/19 <br />Mon <br />NPDES Permit No. <br />Reviewed <br />WAR307390 <br />CONSTRUCTION STORMWATER <br />GENERAL PERMIT - FIELD REPORT <br />Project Name Job Location Client/Owner <br />Riverview Apartments 1616 E Marine View Drive, Everett Heartland Construction LLC <br />Monitoring, Records & Recommendations <br />Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? ❑ Yes 0 No <br />List the completed, not -yet -completed, or ongoing action items in the table below: <br />Actions Items <br />Completed? <br />(Yes; No; Ongoing) <br />Date <br />(If Completed) <br />Cover all soil stockpiles if unworked for 2+ days <br />Ongoing <br />Regularly sweep up track out on the road <br />Ongoing <br />Monitor contaminated soil excavation so that contamination stays contained <br />Ongoing <br />Concrete wash basins may overflow with high pH water when it rains, need to be covered <br />Ongoing <br />Monitor straw wattles surrounding catch basins to ensure they do not become overtopped with <br />eroded sediment <br />Ongoing <br />9 g <br />Current Weather: 300s. Rain <br />Precipitation since last inspection (approximate): 0.49 inches <br />Precipitation in the last 24 hours (approximate): 0.00 inches <br />Was water quality sampling part of this inspection? ❑ Yes Q No <br />If "Yes': <br />• Record results in the table below. <br />i <br />• Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, if <br />present: <br />• Hanna Turbidity Meter# <br />Monitoring Location Turbidity pH Notes <br />(NTU) <br />Is the site in compliance with the SWPPP and the permit requirements? Q Yes ❑ No <br />If "No": <br />• Indicate the tasks necessary to bring the site into compliance in the table above. <br />• Has the non-compliance been reported to the Department of Ecology? ❑ Yes ❑ No <br />• Should the SWPPP be modified? ❑ Yes ❑ No <br />"This report is true, accurate, and complete to the best of my knowledge and belief." <br />Insoecfor'Name: Emmett Hartlev. CESCL Number. EF8183444 Insaection Date:12/30/19 <br />