Laserfiche WebLink
Riverview Apartments <br />Stormwater Pollution Prevention Plan <br />�J <br />• <br />2 Construction Stormwater Best Management Practices (BMPs) <br />The SWPPP is a living document reflecting current conditions and changes throughout the life <br />of the project. These changes may be informal (i.e., hand-written notes and deletions). Update <br />the SWPPP when the CESCL has noted a deficiency in BMPs or deviation from original design. <br />2.1 The 12 Elements <br />2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits <br />To protect adjacent properties and to reduce the area of soil exposed to construction, <br />the limits of construction will be clearly marked before land -disturbing activities begin. <br />Trees that are to be preserved, as well as all sensitive areas and their buffers, shall be <br />clearly delineated, both in the field and on the plans. In general, natural vegetation and <br />native topsoil shall be retained in an undisturbed state to the maximum extent possible. <br />Tree protection will be provided for all trees to remain, including all trees adjacent to the <br />work and outside the construction limits as noted on the drawings. <br />List and describe BMPs: <br />Installation Schedules: <br />BMP C1O1: Preserving Natural Vegetation <br />BMP C102: Buffer Zones <br />BMP C103: High Visibility Fence <br />Inspection and Maintenance plan: <br />Responsible Staff: <br />CPH Project No. 0024-17-037 <br />CP I H CONSULTANTS <br />August 28, 2018 <br />Page 6 <br />