My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
1622
>
WHOLE SITE
>
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:59:04 PM
Creation date
5/5/2021 11:01:10 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverview Apartments <br />Stormwater Pollution Prevention Plan <br />2.1.8 Element 8: Stabilize Channels and Outlets <br />Where site runoff is to be conveyed in channels, or discharged to a stream or some other <br />natural drainage point, efforts will be taken to prevent downstream erosion. <br />All temporary on -site conveyance channels shall be designed, constructed, and stabilized to <br />prevent erosion from the expected peak 10 minute velocity of flow from a Type 1A, 10-year, 24- <br />hour recurrence interval storm for the developed condition. Alternatively, the 10-year, 1-hour <br />peak flow rate indicated by an approved continuous runoff simulation model, increased by a <br />factor of 1.6, shall be used. Stabilization, including armoring material, adequate to prevent <br />erosion of outlets, adjacent stream banks, slopes, and downstream reaches shall be provided at <br />the outlets of all conveyance systems. <br />Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br />adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br />conveyance systems. <br />List and describe BMPs: BMP C209: Outlet Protection <br />BMP C220: Storm Drain Inlet Protection <br />Installation Schedules: <br />Inspection and Maintenance plan: <br />Responsible Staff: <br />CPH Project No. 0024-17-037 August 28, 2018 <br />CP I H CONSULTANTS Page 13 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.