Laserfiche WebLink
Riverview Apartments <br />Stormwater Pollution Prevention Plan <br />Process water and slurry resulting from sawcutting and surfacing operations will be <br />prevented from entering the waters of the State by implementing Sawcutting and 40 <br />Surfacing Pollution Prevention measures (BMP C152). <br />Concrete and grout. <br />• Process water and slurry resulting from concrete work will be prevented from <br />entering downstream surface waters by implementing Concrete Handling measures <br />(BMP C151). <br />Sanitary wastewater., <br />• Portable sanitation facilities will be firmly secured, regularly maintained, and emptied <br />when necessary. <br />Solid Waste: <br />• Solid waste will be stored in secure, clearly marked containers. <br />Other.' <br />• Other BMPs will be administered as necessary to address any additional pollutant <br />sources on site. <br />As per the Federal regulations of the Clean Water Act (CWA) and according to Final Rule 40 <br />CFR Part 112, as stated in the National Register, a Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan is required for construction activities. The Contractor shall <br />prepare an SPCC Plan according to the Washington State Department of Transportation • <br />(WSDOT) Requirements (see the WSDOT Standard Specifications for Road, Bridge, and <br />Municipal Construction 2004) to address an approach to prevent, respond to, and report spills or <br />releases to the environment that could result from construction activities. This Plan must: <br />• Be well thought out in accordance with good engineering; <br />• Achieve three objectives - prevent spills, contain a spill that occurs, and clean up the <br />spill; <br />• Identify the name, location, owner, and type of facility; <br />• Include the date of initial operation and oil spill history; <br />• Name the designated person responsible; <br />• Show evidence of approval and certification by the person in authority; and <br />• Contain a facility analysis. <br />List and describe BMPs: <br />Installation Schedules: <br />Inspection and Maintenance plan: • <br />Responsible Staff: <br />CPH Project No. 0024-17-037 August 28, 2018 <br />CP I H CONSULTANTS Page 15 <br />