My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
1622
>
WHOLE SITE
>
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:59:04 PM
Creation date
5/5/2021 11:01:10 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverview Apartments Stormwater Pollution Prevention Plan <br />2.1.11 Element 11: Maintain BMPs . <br />All temporary and permanent Erosion and Sediment Control (ESC) BMPs shall be maintained <br />and repaired as needed to ensure continued performance of their intended function. <br />Maintenance and repair shall be conducted in accordance with each particular BMP <br />specification (see Volume 11 of the SWMMWW or Chapter 7 of the SWMMEW). <br />Visual monitoring of all BMPs installed at the site will be conducted at least once every calendar <br />week and within 24 hours of any stormwater or non-stormwater discharge from the site. If the <br />site becomes inactive and is temporarily stabilized, the inspection frequency may be reduced to <br />once every calendar month. <br />All temporary ESC BMPs shall be removed within 30 days after final site stabilization is <br />achieved or after the temporary BMPs are no longer needed. <br />Trapped sediment shall be stabilized on -site or removed. Disturbed soil resulting from removal <br />of either BMPs or vegetation shall be permanently stabilized. <br />Additionally, protection must be provided for all BMPs installed for the permanent control of <br />stormwater from sediment and compaction. BMPs that are to remain in place following <br />completion of construction shall be examined and restored to full operating condition. If <br />sediment enters these BMPs during construction, the sediment shall be removed and the facility <br />shall be returned to conditions specified in the construction documents. <br />• <br />• <br />CPH Project No. 0024-17-037 August 28, 2018 <br />CP I H CONSULTANTS Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.