Laserfiche WebLink
• erosion. Construction procedures that limit land clearing provide timely <br />installation of erosion and sedimentation controls, and restore protective <br />cover quickly can significantly reduce the erosion potential of a site. <br />• <br />• <br />Design • Minimize construction during rainy periods. <br />Considerations • Schedule projects to disturb only small portions of the site at any one <br />time. Complete grading as soon as possible. Immediately stabilize the <br />disturbed portion before grading the next portion. Practice staged <br />seeding in order to revegetate cut and fill slopes as the work <br />progresses. <br />Volume II — Construction Stormwater Pollution Prevention - August 2012 <br />4-SS <br />