the project size, expected timing and duration of construction, or • <br />downstream conditions warrant a higher level of protection. If no <br />hydrologic analysis is required, the Rational Method may be used. <br />Determine the required surface area at the top of the riser pipe with the <br />equation: <br />SA = 2 x Q210.00096 or <br />2080 square feet per cfs of inflow <br />See BMP C240 for more information on the derivation of the surface <br />area calculation. <br />The basic geometry of the pond can now be determined using the <br />following design criteria: <br />• Required surface area SA (from Step 2 above) at top of riser. <br />• Minimum 3.5-foot depth from top of riser to bottom of pond. <br />• Maximum 3H:1 V interior side slopes and maximum 2H:1 V exterior <br />slopes. The interior slopes can be increased to a maximum of 2H:1 V if <br />fencing is provided at or above the maximum water surface. <br />• One foot of freeboard between the top of the riser and the crest of the <br />emergency spillway. <br />• Flat bottom. <br />• Minimum 1-foot deep spillway. <br />• Length -to -width ratio between 3:1 and 6:1. <br />• Sizing of Discharge Mechanisms. <br />The outlet for the basin consists of a combination of principal and <br />emergency spillways. These outlets must pass the peak runoff <br />expected from the contributing drainage area for a 100-year storm. If, <br />due to site conditions and basin geometry, a separate emergency spill- <br />way is not feasible, the principal spillway must pass the entire peak <br />runoff expected from the 100-year storm. However, an attempt to <br />provide a separate emergency spillway should always be made. The <br />runoff calculations should be based on the site conditions during <br />construction. The flow through the dewatering orifice cannot be <br />utilized when calculating the 100-year storm elevation because of its <br />potential to become clogged; therefore, available spillway storage <br />must begin at the principal spillway riser crest. <br />The principal spillway designed by the procedures contained in this <br />standard will result in some reduction in the peak rate of runoff. <br />However, the riser outlet design will not adequately control the basin <br />discharge to the predevelopment discharge limitations as stated in <br />Minimum Requirement #7: Flow Control. However, if the basin for a <br />permanent stormwater detention pond is used for a temporary <br />• <br />Volume II — Construction Stormwater Pollution Prevention - August 2012 <br />4-105 <br />