Construction Stormwater Site Inspection Form <br />•Project Name <br />Permit # <br />Inspection Date <br />Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre <br />Print Name: <br />Approximate rainfall amount since the last inspection (in inches): <br />Approximate rainfall amount in the last 24 hours (in inches): <br />Current Weather Clear Cloudy ❑ Mist ❑ Rain ❑ Wind ❑ Fog ❑ <br />A. Type of inspection: Weekly ❑ Post Storm Event ❑ Other ❑ <br />B. Phase of Active Construction (check all that apply): <br />Time <br />Pre Construction/installation of erosion/sediment controls Clearing/Demo/Grading Infrastructure/storm/roads <br />Concrete pours Vertical Construction/buildings Utilities <br />Offsite improvements Site temporary stabilized Final stabilization <br />C. Questions: <br />1. Were all areas of construction and discharge points inspected? Yes No <br />2. Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen Yes No <br />•3. Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5) Yes No <br />4. Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?* Yes No <br />5. If yes to #4 was it reported to Ecology? Yes No <br />6. Is pH sampling required? pH range required is 6.5 to 8.5. Yes No <br />If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken, <br />and when. <br />*If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33 <br />cm or greater. <br />Sampling Results: Date: <br />Parameter <br />Method (circle one) <br />Result <br />Other/Note <br />NTU <br />cm <br />pH <br />Turbidity <br />tube, meter, laboratory <br />pH <br />Paper, kit, meter <br />• <br />Page 1 <br />