My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
1622
>
WHOLE SITE
>
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:59:04 PM
Creation date
5/5/2021 11:01:10 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Stormwater from facilities located on "Indian Country" as defined in 18 <br />U.S.C.§ 1151, except portions of the Puyallup Reservation as noted below. <br />Indian Country includes: <br />a. All land within any Indian Reservation notwithstanding the issuance of any <br />patent, and, including rights -of -way running through the reservation. This <br />includes all federal, tribal, and Indian and non -Indian privately owned land <br />within the reservation. <br />b. All off -reservation Indian allotments, the Indian titles to which have not been <br />extinguished, including rights -of -way running through the same. <br />c. All off -reservation federal trust lands held for Native American Tribes. <br />Puyallup Exception: Following the Puyallup Tribes of Indians Land <br />Settlement Act of 1989, 25 U.S,C. § 1773; the permit does apply to land within <br />the Puyallup Reservation except for discharges to surface water on land held <br />in trust by the federal government. <br />5. Stormwater from any site covered under an existing NPDES individual permit in <br />which stormwater management and/or treatment requirements are included for all <br />stormwater discharges associated with construction activity. <br />6. Stormwater from a site where an applicable Total Maximum Daily Load (TMDL) <br />requirement specifically precludes or prohibits discharges from construction <br />activity. 0 <br />S2. APPLICATION REQUIREMENTS <br />A. Permit Application Forms <br />1. Notice of Intent Form/Timeline <br />a. Operators of new or previously unpermitted construction activities must submit <br />a complete and accurate permit application (Notice of Intent, or NOI) to <br />Ecology. <br />b. Operators must apply using the electronic application form (NOI) available on <br />Ecology's website http://www.ecy.wa.goy/programs/wq/stonnwater/ <br />construction/index.htm]. Permittees unable to submit electronically (for <br />example, those who do not have an internet connection) must contact Ecology <br />to request a waiver and obtain instructions on how to obtain a paper NOI. <br />Department of Ecology <br />Water Quality Program - Construction Stormwater <br />PO Box 47696 <br />Olympia, Washington 98504-7696 <br />Construction Stormwater General Permit <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.