Laserfiche WebLink
• i. The name, title, and signature of the person conducting the site inspection, a <br />phone number or other reliable method to reach this person, and the following <br />statement: "I certify that this report is true, accurate, and complete to the best of <br />my knowledge and belief." <br />• <br />Table 3: Summary of Primary Monitoring Requirements <br />Size of Soil <br />Weekly Site <br />Weekly <br />Weekly <br />Weekly pH <br />CESCL <br />Disturbance) <br />Inspections <br />Sampling w/ <br />Sampling w/ <br />Sampling <br />Required for <br />Turbidity <br />Transparency <br />Inspections? <br />Meter <br />Tube <br />Sites that disturb <br />Required <br />Not Required <br />Not Required <br />Not Required <br />No <br />less than 1 acre, but <br />are part of a larger <br />Common Plan of <br />Development <br />Sites that disturb 1 <br />Required <br />Sampling Required — <br />Required <br />Yes <br />acre or more, but <br />either method' <br />fewer than 5 acres <br />Sites that disturb 5 <br />Required <br />Required <br />Not Required' <br />Required <br />Yes <br />acres or more <br />' Soil disturbance is calculated by adding together all areas that will be affected by construction activity. <br />Construction activity means clearing, grading, excavation, and any other activity that disturbs the surface of the <br />land, including ingress/egress from the site. <br />2 If construction activity results in the disturbance of 1 acre or more, and involves significant concrete work (1,000 <br />cubic yards of poured concrete or recycled concrete over the life of a project) or the use of engineered soils (soil <br />amendments including but not limited to Portland cement -treated base [CTB], cement kiln dust [CKD], or fly ash), <br />and stormwater from the affected area drains to surface waters of the State or to a storm sewer stormwater collection <br />system that drains to other surface waters of the State, the Permittee must conduct pH sampling in accordance with <br />Special Condition S4.13. <br />' Sites with one or more acres, but fewer than 5 acres of soil disturbance, must conduct turbidity or transparency <br />sampling in accordance with Special Condition S4.C. <br />' Sites equal to or greater than 5 acres of soil disturbance must conduct turbidity sampling using a turbidity meter in <br />accordance with Special Condition S4.C. <br />• <br />Constrzrc,tion Stortitivcrier Generol Permit <br />Page: 15 <br />