Laserfiche WebLink
submit DMR forms to be received by Ecology within 15 days following the end of each <br />month. <br />If there was no discharge during a given monitoring period, all Permittees must submit a <br />DMR as required with "no discharge" entered in place of the monitoring results. DMRs <br />are required for the full duration of permit coverage (from issuance date to termination). <br />For more information, contact Ecology staff using information provided at the following <br />web site: www.ecy.wa.gov/programs/wq/permits/paris/contacts.html.. <br />C. Records Retention <br />The Permittee must retain records of all monitoring information (site log book, sampling <br />results, inspection reports/checklists, etc.), Stormwater Pollution Prevention Plan, copy <br />of the permit coverage letter (including Transfer of Coverage documentation), and any <br />other documentation of compliance with permit requirements for the entire life of the <br />construction project and for a minimum of three years following the termination of <br />permit coverage. Such information must include all calibration and maintenance records, <br />and records of all data used to complete the application for this permit. This period of <br />retention must be extended during the course of any unresolved litigation regarding the <br />discharge of pollutants by the Permittee or when requested by Ecology. <br />D. Recording Results <br />For each measurement or sample taken, the Permittee must record the following <br />information: <br />1. Date, place, method, and time of sampling or measurement. <br />2. The first and last name of the individual who performed the sampling or <br />measurement. <br />The date(s) the analyses were performed. <br />4. The first and last name of the individual who performed the analyses. <br />5. The analytical techniques or methods used. <br />6. The results of all analyses. <br />E. Additional Monitoring by the Permittee <br />If the Permittee monitors any pollutant more frequently than required by this permit <br />using test procedures specified by Special Condition S4 of this permit, the results of this <br />monitoring must be included in the calculation and reporting of the data submitted in the <br />Permittee's DMR. <br />F. Noncompliance Notification <br />In the event the Permittee is unable to comply with any part of the terms and conditions <br />of this permit, and the resulting noncompliance may cause a threat to human health or <br />the environment (such as but not limited to spills of fuels or other materials, catastrophic <br />pond or slope failure, and discharges that violate water quality standards), or exceed <br />Construction Slorinwater General I'ermil <br />Page 21 <br />