" of -Way for any other future use as determined by the Grantor (subject to <br />reasonable advance notification to Grantee), and shall at all times conduct its <br />activities on the Permit Area so as not to interfere with, obstruct or endanger public <br />use or the Grantor's operations, facilities or utilities. <br />Grantee shall install the System, and shall conduct any other activity on the Right of <br />Way as may be communicated to Grantee by the Grantor for the purpose of <br />operating and managing the System, protecting the Grantor's facilities, preventing <br />hazardous conditions, and preventing interruptions to the public use of the Right of <br />Way and Grantor's facilities, operations and utilities. <br />Grantee and its agents and representatives shall, at its expense, comply with all <br />applicable laws, regulations, permits or requirements of any governing authority <br />affecting the Right of Way and the Permit Area and the use thereof. Upon request, <br />Grantee shall supply Grantor with copies of permits or orders. <br />.............. <br />3. Coordination of Activities: <br />Grantee shall give at least 15 days advanced written notice of the proposed dates of <br />its construction, repair and maintenance activities on the Right of Way to Grantor at <br />the address in Section 19 or at such address or office as Grantor may from time to <br />time designate. Grantee shall cooperate in the revision of such dates and/or the <br />coordination of its activities with those of Grantor if deemed necessary by Grantor <br />to minimize conflicts, insure protection to each parties' facilities, prevent hazardous <br />conditions, or minimize interruption of Grantor's operations and the public use of <br />the Right -of -Way. Provided, however, that in the event of an emergency requiring <br />immediate action by Grantee for the protection of the shoring wall or other persons <br />or property, Grantee may take such action upon notice to Grantor as is reasonable <br />under the circumstances. <br />4. Permission: <br />It is agreed that prior to any installation or modification of the System within the <br />permit herein granted, the Grantee will first supply the Grantor with detailed <br />drawings and specifications relating to such proposed construction. No <br />construction, installation or modification of the System will be performed until the <br />plans have been approved in writing by the Grantorly; provided, however, that the <br />approval of the Grantor to the performance of such construction shall not in any <br />manner be considered as imposing any obligation upon the Grantor as to safety or <br />propriety of such installation or construction. Upon completion of such installation <br />or construction, the Grantee shall remove all debris and restore the ground surface <br />of the Right -of -Way to as nearly as possible to the condition in which it was at the <br />commencement of such work. <br />