My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR BUILDING B 2022-08-29
>
Address Records
>
E MARINE VIEW DR
>
1622
>
BUILDING B
>
1622 E MARINE VIEW DR BUILDING B 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 9:54:22 AM
Creation date
5/5/2021 3:50:08 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
BUILDING B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Summary, r._. 1 PROJ-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> General Info Project Title: Riverview Apartments-BLDG B Date 12/31/2018 <br /> PROJ-SUM form Project Street Address: 1622 East Marine View Drive For Building Department Use <br /> shall be provided as Project City,County,Zip: Everett,WA <br /> a cover sheet for all <br /> compliance form Project Owner or Rep: Riverview I,LLC <br /> submittals.Project <br /> Title shall match Jurisdiction: City of Everett <br /> project plans title <br /> block. <br /> Project Description New Construction and Additions <br /> Select all that apply to the 0 New Building ❑ Building Addition <br /> scope of project. <br /> Select Addition+Existing or Existing Building Retrofit <br /> Alteration+Existing if the <br /> existing building will be ❑Alteration ❑Change of Occupancy ❑Change in Space Conditioning <br /> combined with the addition <br /> or alteration to demonstrate <br /> compliance per Section ❑ Historic Building <br /> C502.1 or C503.1. <br /> Building Elements Scope-Select all that apply <br /> ❑All ❑✓ Building Envelope ❑Mechanical Systems <br /> ❑Service Hot Water Systems ❑ Lighting Systems ❑Electrical Systems <br /> 0 All Commercial 0 Group R-R2,R3,&R4 0 Mixed Use <br /> over 3 stories and all R1 <br /> Occupancy Type Mixed Use-Building is greater than three stories above grade and it has both Commercial and Group R <br /> P Y YP occupancies. <br /> Mixed Occupancy-Building is three stories or less above grade and it has both Commercial and Group <br /> R2,R3 or R4 occupancies.Select All Commercial to document compliance for the commercial areas of <br /> the building. The residential spaces shall comply with the WSEC Residential Provisions. <br /> Select all that apply to the scope of project <br /> 0 Fully Conditioned ❑ Semi-heated2 ❑ Refrigerated Spaces <br /> (Warehouse and/or Walk-in') <br /> Space Conditioning ElLow Energy Space Category3 <br /> Categories Eligible Low Energy Spaces <br /> ❑Unconditioned ❑ Low energy heating/cooling capacity <br /> ❑Wireless service ❑ Greenhouse4 ❑Equipment building <br /> equipment shelter <br /> Floors Above <br /> Floor Area and Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area <br /> Stories 4 31,088 257,728 <br /> Compliance Method 1 -General C Compliance Method 2-Total Building Performance <br /> Compliance Method 1-Projects shall demonstrate compliance with all applicable mandatory and <br /> prescriptive requirements of this code. Refer to C401.2,Item 1 for more information. Compliance forms to <br /> General Compliance include with a Prescriptive submittal:All applicable ENV,LTG,and MECH. <br /> Path Compliance Method 2-Projects complying via total building performance(TBP)shall include a summary of <br /> results from a whole building energy model per Section C407 and shall demonstrate compliance with all <br /> applicable mandatory provisions in this Code.Refer to Section C401.2,Item 2 for more information. <br /> Compliance forms to include with a TBP submittal:PROJ-SUM,ENV-CHK,LTG-EXT,LTG-CHK,and all <br /> MECH forms except MECH-ECONO and MECH-VENT(pending). <br /> Note 1-Refrigerated Spaces-They shall comply with the envelope and refrigeration equipment requirements in Section C410. Warehouse <br /> coolers and freezers shall also comply with the envelope requirements in C402. C410 takes precedent for overlapping requirements. <br /> Note 2-Semi-heated Spaces-If heated with equipment other than electric resistance may take an exemption for wall insulation.All other <br /> envelope assemblies shall comply with the thermal envelope provisions. <br /> Note 3-Exemptions For Low Energy Spaces-Low Energy spaces are exempt from all provisions in WSEC Section C402 Building Envelope, <br /> however all other applicable provisions in the Code do apply including lighting,mechanical,service water heating,etc. <br /> Note 4-Eligible Space Conditioning For Low Energy Greenhouses-Greenhouses are defined as spaces that maintain a specialized sunlit <br /> environment that is used exclusively for cultivation,protection and maintenance of plants.Cooling with outside air and/or evaporative <br /> cooling,and any form of heating equipment,are allowed under the Low Energy Greenhouse category.Greenhouses with cooling <br /> equipment that requires a condensing unit are NOT eligible. <br /> // <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.