My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR BUILDING C 2022-08-29
>
Address Records
>
E MARINE VIEW DR
>
1622
>
BUILDING C
>
1622 E MARINE VIEW DR BUILDING C 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 10:48:10 AM
Creation date
5/5/2021 4:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
BUILDING C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table R402.1.1 Footnotes <br /> For SI: 1 foot .= 304.8 mm, ci .= cenuous insulation, int .= intermediate frail. <br /> a R-values are minimums. U-factors and SHGC are maximums. When insulation is installed in a cavity which is <br /> less than the label or design thickness of the insulation, the compressed R-value of the insulation from <br /> Appendix Table A101.4 shall not be less than the R-value specified in the table. <br /> b The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed fenestration. <br /> "10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall, or R-15 on the continuous <br /> insulation on the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the <br /> basement wall at the interior of the basement wall. "10/15/21.+TB" shall be permitted to be met with R-13 <br /> cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior <br /> of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity <br /> insulation at the interior of the basement wall. "TB" means thermal break between floor slab and basement <br /> wall. <br /> d R-10 continuous insulation is required under heated slab on grade floors.See R402.2.9.1. <br /> e There are no SHGC requirements in the Marine Zone. <br /> Reserved. <br /> g Reserved. <br /> h Reserved. <br /> 'The second R-value applies when more than half the insulation is on the interior of the mass wall. <br /> Reserved. <br /> k For single rafter-or joist-vaulted ceilings, the insulation may be reduced to R-38. <br /> Reserved. <br /> m Int. (intermediate framing) denotes standard framing 16 inches on center with headers insulated with a <br /> minimum of R-10 insulation. <br /> Table R402.1.3 Footnote <br /> a Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as <br /> specified in Section R402.1.3. <br /> lI <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.