My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 4/12/2021
>
Contracts
>
6 Years Then Destroy
>
2024
>
Murraysmith Inc. 4/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 2:37:24 PM
Creation date
5/6/2021 2:36:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
4/12/2021
Council Approval Date
4/7/2021
End Date
12/31/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
2023 Comprehensive Sewer Plan
Public Works WO Number
3753
Tracking Number
0002889
Total Compensation
$1,495,314.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections) of CCTV records to review and provide recommendations on how the City should <br /> score similar deficiencies in the future. <br /> 7.7 Condition Assessment Workshop <br /> Conduct a workshop with City staff to review the results of the condition assessment, confirm <br /> the feasibility of alternatives. <br /> 7.8 Risk and Resiliency Analysis and Management <br /> Compile Asset-Threat pairing using the existing collection and conveyance facility inventory and <br /> the resiliency threat characterization from Task 4. Conduct consequence, vulnerability, and <br /> likelihood of failure analysis to summarize existing system resiliency for the collection system. <br /> Perform desktop analysis using the resiliency definitions from Task 4, existing system resiliency <br /> summarized in Task 5, and collection system condition from Task 6.6 to identify areas that do not <br /> meet the resiliency goals. Develop a risk matrix for the collection and conveyance system including <br /> qualitative likelihood of failure and qualitative consequence of failure using the results of the <br /> desktop analysis. City to approve criteria for likelihood of failure and consequence of failure prior <br /> to compiling the matrix. The risk matrix to be used to identify and prioritize capital improvement <br /> projects to address collection system condition and resiliency deficiencies. <br /> 7.9 Resiliency Assessment Workshop <br /> Prepare for, conduct, and attend a workshop with City staff to review the results of the risk and <br /> resiliency analysis and to confirm the feasibility of alternatives. <br /> 7.10 Draft Chapter 3—Sewer System Evaluation <br /> Develop the Draft Chapter 3 by compiling the Task 6 results. Submit draft to City for review and <br /> revise per comments.The Chapter to include sections for hydraulic analysis,condition assessment, <br /> and resiliency analysis. <br /> Receivables <br /> • Information on collection system asset condition to facilitate desktop review of piped <br /> systems. <br /> • Climate change information characterizing expected changes to rainfall patterns <br /> (intensities, volumes) in the Everett area. <br /> • Comments on Draft Chapter 3 <br /> • Input on Pump Station Condition Assessment form <br /> City of Everett MURRAYSMITH 2023 Comprehensive Sewer Plan <br /> March 2021 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.