My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 4/12/2021
>
Contracts
>
6 Years Then Destroy
>
2024
>
Murraysmith Inc. 4/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 2:37:24 PM
Creation date
5/6/2021 2:36:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
4/12/2021
Council Approval Date
4/7/2021
End Date
12/31/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
2023 Comprehensive Sewer Plan
Public Works WO Number
3753
Tracking Number
0002889
Total Compensation
$1,495,314.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AQS ENVIRONMENTAL ADS <br /> SERVICES® <br /> Project Description <br /> Approach: ADS LLC proposes use of proven technology, certified project team and ISO 9001 processes to <br /> successfully perform flow monitoring requirements. <br /> Project: City of Everett Flow Monitoring <br /> Service Type: Temporary Flow Monitoring Services <br /> Equipment Type: ADS Triton+®,flow meter (Details Appendix A) <br /> Project Duration: Nine (9) Months <br /> Traffic Control: No <br /> Prevailing Wage: No <br /> Monitoring Locations: Twenty-nine (29)flow <br /> Requested Start Date: 1-July 2021 <br /> Proposal Pricing <br /> The following Pricing Table includes all work as outlined in the Scope of Work(SOW), detailed below. <br /> Acceptance of this proposal for the purchase of ADS services constitutes your and/or your company's <br /> agreement to ADS' Standard Terms and Conditions of Sale found at: https://www.adsenv.com/ads- <br /> services-terms-and-conditions/. <br /> Pricing Table <br /> ITEM ITEM DESCRIPTION COST <br /> Mobilization,flow monitors, data editing and final <br /> 1 report. See Scope of Work(next section)for $339,039 <br /> complete mobilization details. <br /> Total Project Cost Project INCLUDING Tax $339,039 <br /> Extension Option <br /> 1 Extension of monitoring period rate per meter per <br /> month. $1,299 <br /> Pricing Assumptions: <br /> • Quotation Validity: through June 15, 2021 <br /> • Payment: Net 30-days with 20%of contract value is due at mobilization. <br /> • Does not assume MBE/WBE requirements. <br /> • Pricing assumes ADS standard Health and Safety procedures and documentation are sufficient. <br /> • Monitoring period extensions: notify ADS prior to the end of the monitoring period. <br /> • Pricing assumes free & legal access to each site and no modifications to the selected monitoring sites <br /> are necessary for installation. <br /> • Additional work requested beyond the scope of services will require additional fees to be negotiated. <br /> ADS,LLC <br /> 340 The Bridge Street• Suite 204 •Huntsville,Alabama <br /> All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.