My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 4/12/2021
>
Contracts
>
6 Years Then Destroy
>
2024
>
Murraysmith Inc. 4/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 2:37:24 PM
Creation date
5/6/2021 2:36:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
4/12/2021
Council Approval Date
4/7/2021
End Date
12/31/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
2023 Comprehensive Sewer Plan
Public Works WO Number
3753
Tracking Number
0002889
Total Compensation
$1,495,314.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aps ENV IR SMENTAL ADS <br /> Phase Ill—Data Editing and Reporting <br /> 1) Data Analysis. Upon completion of the monitoring period,a trained ADS Data Analyst will analyze <br /> and finalize the data. The data analyst will directly calculate flow using the continuity equation from <br /> recorded depth and average velocity data. Flow quantities as determined by the continuity equation <br /> will be plotted. The analyst will also utilize scatter plots (depths vs. velocity readings) both to verify <br /> monitor accuracy. <br /> 2) Data Delivery and Final Report. ADS will report final depth,velocity and quantity for reviewing and <br /> downloading via the ADS PRISM online reporting system. <br /> NOTE: ADS's Flow monitors are capable of providing high accuracy, precise (repeatable) flow data. <br /> However, under some complex hydraulic conditions such as frequent backwater, surcharging, reverse <br /> flows, and complex bends in the flow path leading to/from the associated manhole monitor location, data <br /> accuracy may be diminished. It is understood that data quality may be compromised in locations <br /> immediately upstream of pump stations or other locations where the above listed hydraulic conditions can <br /> sometimes be persistent. <br /> Client and City Responsibilities: <br /> 1) Access to the site of work with sufficient area for placement of personnel and equipment, including <br /> all right-of-way and ramps, if required. <br /> 2) Client to pay for all permit fees and provide traffic control services. City covers applicable Permit <br /> Fees. <br /> 3) If sewer/storm line is dirty and full of debris, ensure that selected sites have been jet cleaned to <br /> minimize hydraulic deficiencies or select an alternate location. <br /> 4) Provide any known information concerning bypasses, overflows, base flows, critical surcharge areas, <br /> and maintenance habits. <br /> PLEASE GO TO NEXT PAGE <br /> ADS,LLC <br /> 340 The Bridge Street• Suite 204 • Huntsville,Alabama <br /> All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.