My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/05/12 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/05/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 9:11:54 PM
Creation date
5/12/2021 8:37:52 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CB 2104-13 Fire Station 2 6 PDF.pdf <br />(10) CB 2105-14 - 1st Reading - Adopt Proposed Ordinance creating a Special <br />Improvement Project entitled "17th Street Interceptor Upgrades" Fund 336, Program 020. <br />(3rd and final reading on 5-26-21). <br />Documents: <br />CB 2105-14 17th St Interceptor PDF.pdf <br />(11) CB 2105-15 -1st Reading - Adopt Proposed Ordinance creating a Special Improvement <br />Project entitled "Port Gardner Bay Outfalls Water Quality Treatment Retrofit" Fund 336, <br />Program 019. (3rd and final reading on 5-26-21). <br />Documents: <br />CB 2105-15 Port Gardner Bay PDF.pdf <br />ACTION ITEMS: <br />(12) CB 2104-12 - 3rd and final Reading - Adopt the Proposed Ordinance creating a <br />Special Improvement Project entitled "40th Place Landslide Repair" Fund 303, Program <br />122. <br />Documents: <br />CB2104-12.pdf <br />(13) Authorize the Mayor to sign the Professional Services Agreement with Brown and <br />Caldwell, Inc., to provide engineering consultant services for the Water Filter Plant Portal 4 <br />Improvements project for a total amount not to exceed $257,852.00. <br />Documents: <br />WFP Portal Brown Caldwell PDF.pdf <br />(14) Authorize the Mayor to sign Amendment No. 2 to the Professional Services Agreement <br />with Sazan Group, Inc., for Water Filter Plant Emergency Generator design, bidding, and <br />construction support services to include additional analysis and design services, extend the <br />contract completion date, and increase the compensation by $284,549.00 for a total <br />amount not to exceed $1,435,365.00. <br />Documents: <br />WFP Emergency Gen Sazan PDF.pdf <br />COUNCIL BRIEFING AGENDA: (These items come before the City Council serving as a <br />Council Committee of the Whole and are likely to be scheduled at a future meeting.) <br />(15) 2021 Legislative Update. <br />Documents: <br />Legislative Update PDF (1).pdf <br />(16) Adopt Resolution approving the City of Everett 2020 Comprehensive Water Plan and <br />authorize submittal to the Washington State Department of Health. (Action and Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.