My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 5/4/2021 Change Order 1
>
Contracts
>
Capital Contract
>
R.L. Alia Company 5/4/2021 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
5/14/2021 1:38:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
5/4/2021
Council Approval Date
4/28/2021
Department
Public Works
Department Project Manager
Dave Voigt/Mike Kangas
Subject / Project Title
Jackson Park Area Stormwater Separation
Public Works WO Number
UP3703
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002555
Total Compensation
$264,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 12/7/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:Jackson Park Area Stormwater Separation <br /> Change Order No.; 001 <br /> Change Order Effective Date:April 4, 2021 <br /> Exhibit A—Description of Changed Work <br /> Modified Existing Bid Items <br /> Bid Item 9—Crushed Surfacing Base Course. Modify existing item 9 by adding 400 Tons of Crushed <br /> Surfacing Base Course at the unit price of$90.00/Ton resulting in a$36,000.00 increase to the Contract. <br /> Bid Item 26 — Post Construction Soil Quality and Depth. Modify existing item 26 by adding 1,250 <br /> SY of Post Construction Soil Quality and Depth at the unit price of$40.00/SY resulting in a $50,000.00 <br /> increase to the Contract. <br /> Bid Item 27—HMA CL 1/2" PG 64-22 for Permanent Trench Patch. Modify existing item 27 by adding <br /> 550 Tons HMA CL 1/2' PG 64-22 for Permanent Trench Patch at the unit price of$220.00/Ton resulting <br /> in a $121,000.00 increase to the Contract. <br /> Added Bid Items <br /> New Item 101 — CSTC for Pipe Bedding. Add 950 Tons of new item # 101 entitled, "CSTC for Pipe <br /> Bedding" at the agreed unit price $60.00/Ton, resulting in a $57,000.00 increase to the Contract. <br /> Exhibit B—Justification: <br /> Bid Items 9,26&38—Crushed Surfacing Base Course, Post Construction Soil Quality and Depth <br /> and HMA CL %" PG 64-22 for Permanent Trench Patch. These items represent work required for <br /> restoration after pipe installation. Each item over-ran the plan quantity. <br /> New Item 101 — CSTC for Pipe Bedding. The contractor requested utilization CSTC in lieu of CSBC <br /> for pipe bedding. This new item was created to formalize the revision including a reduction in the unit <br /> price from $90.00/Ton to $60.00/ton. <br /> Exhibit C—Additional Contract Time: <br /> There are no additional working days added for this change order. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.