Laserfiche WebLink
1' <br /> NUDES <br /> August 23, 2017 <br /> Polygon Northwest Company <br /> 11624 SE 5`h Street, Suite 200 <br /> Bellevue, WA 98005 <br /> Attention: Michelle Dittman <br /> Building 3 Summary Letter <br /> Geotechnical Construction Observation Services <br /> Everett Riverfront Eclipse Site <br /> Everett, Washington <br /> GeoDesign Project: Polygon-128-03 <br /> 3313 31 s` Drive(Permit No. C1604-026) <br /> 331 5 31 s` Drive(Permit No. C1604-027) <br /> 3317 31 s` Drive (Permit No. C1604-028) <br /> 3319 31 s` Drive (Permit No. C1604-029) <br /> 3321 31 s` Drive (Permit No. C1604-030) • <br /> 3323 31 5' Drive (Permit No. C1604-031) <br /> This letter provides a summary of GeoDesign, Inc.'s geotechnical construction observation <br /> services for Building 3 of the Everett Riverfront Eclipse Site in Everett,Washington. GeoDesign <br /> prepared a geotechnical report for this project' that summarized the site conditions and <br /> provided our geotechnical recommendations. We received a set of building construction plans <br /> for the project that were prepared by Core Design and dated July 2015. <br /> Members of our geotechnical staff visited the site on a periodic basis between May 2015 and <br /> February 201 7 to perform the following tasks: <br /> • Observe the placement of structural fill and evaluate the compaction of the fill by conducting <br /> in situ density and moisture content measurements and by observing proof rolling <br /> • Observe the placement of surcharge material and install settlement markers <br /> • Monitor the surcharge settlement <br /> • Observe the installation of ground improvement trenches <br /> ' GeoDesign, Inc.,2017. Report of Geotechnical Engineering Services;Everett Riverfront Eclipse Site;Everett, Washington, <br /> dated March 16,2017. GeoDesign Project: Polygon-128-01 <br /> 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 www.geodesigninc.com <br />