• <br /> • <br /> • <br /> • <br /> • Construction traffic should be limited to unpaved portions of the road or temporary haul roads <br /> • to prevent disturbance of the subgrade. Construction traffic should not be allowed on new <br /> pavements, unless an allowance for these construction loads was included in the pavement <br /> design. <br /> • A submittal should be made for each pavement material prior to the start of paving operations. <br /> Each submittal should include the test information necessary to evaluate the degree to which the <br /> • material's properties comply with the properties that were recommended or specified. The <br /> • project geotechnical engineer and other appropriate members of the design team should review <br /> • each submittal. <br /> • 7.0 OBSERVATION OF CONSTRUCTION <br /> • <br /> • Satisfactory foundation and earthwork performance depends to a large degree on quality of <br /> • construction. Sufficient observation of the contractor's activities is a key part of determining that <br /> • the work is completed in accordance with the construction drawings and specifications. <br /> Subsurface conditions observed during construction should be compared with those <br /> • encountered during the subsurface exploration. Recognition of changed conditions often <br /> • requires experience; therefore, qualified personnel should visit the site with sufficient frequency <br /> • to detect if subsurface conditions change significantly from those anticipated. <br /> • We recommend that GeoDesign be retained to observe earthwork activities. We anticipate that <br /> • this will consist of settlement monitoring, evaluating footing, floor slab, driveway, and pavement <br /> • subgrade, observing the placement of structural fill, cement amendment activities, repair of soft <br /> • subgrade areas, asphalt paving, retaining wall construction, and performing laboratory <br /> compaction and field moisture-density tests. <br /> • <br /> • 8.0 LIMITATIONS <br /> •• We have prepared this report for use by Polygon Northwest Company and their design and <br /> construction team for the proposed project. The data and report can be used for bidding or <br /> • estimating purposes, but our report, conclusions, and interpretations should not be construed as <br /> • warranty of the subsurface conditions and are not applicable to other sites. <br /> • Exploration observations indicate soil conditions only at specific locations and only to the depths <br /> • penetrated. They do not necessarily reflect soil strata or water level variations that may exist <br /> • between exploration locations. If subsurface conditions differing from those described are noted <br /> • during the course of excavation and construction, re-evaluation will be necessary. <br /> • The site development plans and design details were preliminary at the time this report was <br /> • prepared. When the design has been finalized and if there are changes in the site grades or <br /> • location, configuration, design loads, or type of construction for the buildings, the conclusions <br /> • and recommendations presented may not be applicable. If design changes are made, we request <br /> • that we be retained to review our conclusions and recommendations, and to provide a written <br /> modification or verification. <br /> • <br /> • <br /> G EO DESIGN? 23 Polygon-128-01:091615 <br />