Laserfiche WebLink
Test Pit Log <br /> • Project Name: Sheet of <br />• Eclipse Mill Property 1 1 <br />• Job No. Logged by: Date: Test Pit No.: <br /> 7989 MGM 11/27/00 TP-13 <br /> Excavation Contactor. Ground Surface Elevation: <br />• NW Excavating 14' <br /> • Notes: <br /> • o o = d rn o Surface Conditions: <br /> General W <br /> N i p "' m . e otes (%j <br /> C7 �. va e, <br /> • • ML Dark brown SILT,loose, moist(Fill) <br /> • • <br /> ill <br /> 24.1 •• : 1 11111 <br /> • •�� z I. -contains organics <br /> • • <br /> • <br /> • ���• 3IML Blue gray SILT with sand and gravel,medium dense, moist(Fill) <br /> • <br /> •+•:•: 4 I:. <br /> no <br /> • : • I <br /> -contains abundant concrete debris at 5' <br /> • •••+ s <br /> ���• . -becomes gray <br /> III <br /> NM <br /> • •i• 8MI <br /> • :s:: -milled lumber <br /> ♦♦ <br /> II <br /> • •. 9Ill -logs <br /> • •❖:• 1° , <br /> • • 11 • <br /> • <br /> ♦♦ <br /> 4111 �•i12 II <br /> im <br /> • <br /> ♦♦ <br /> .: 13 111 <br /> -wood debris <br /> • 54.8 MI <br /> 14. �•�•�� I. <br /> • . 15 <br /> • Test pit terminated at 15.5 feet below eAsting grade.Groundwater <br /> seepage encountered at 8.5 feet during excavation. <br /> • <br /> • 8 <br /> • a <br /> • a <br /> 0. <br /> • 5 <br /> • a- <br /> fg ff�d. rf��. ,1441% Test Pit Log <br /> • 410 Earth Consultants Inc. Eclipse Mill Property <br /> C7 \��I) 1iliC irl ceardmicalFnglnexas.Ccobgtsts&FrnAmrm�erxal�drnit+R <br /> . Everett,Washington <br /> • <br /> u, Proj.No. 7989 Dwn. GLS Date Dec.2000 Checked MGM Date 12/19/00 Plate A14 <br /> • Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,analysis and <br /> judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or interpretation by others of <br />