Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • Note: <br /> • Base map and proposed roadway alignment data <br /> • provided by the City of Everett, Jan. 2009. <br /> • Ili Datum: <br /> • ) U co Horiz. =Washington State Plane Coord. <br /> • s (414/ Vert. = NAVD 88 <br /> i-' Sp <br /> • C0 co 0 <br /> 0 <br /> 0 <br /> • + <br /> 0 <br /> o c <br /> • Sta 12+28 CO <br /> a B-1-09 CO a <br /> • Proposed Roadway Alignment (n <br /> a ,n <br /> • +NI <br /> co a -$ <br /> N <br /> '°r'Q7 O^ a+D O <br /> • C O + Cn <br /> r <br /> �_ COm inner <br /> • \ 'R5'4 '� 10 N <br /> I 4e17 s '°° Chestnut Stree �° <br /> • Sta 14+83 Bk n 105i00 10@pp 107.00 t w—■ (Eclipse Mill Road) Cl) <br /> (1992 AS built) a 10°'0p 1m.00 tto uo <br /> • 72"CS 0 _, tft.00 772,. /13.00 �e/fVs/C) <br /> 4 ha; 11�Mp <br /> • Existing m eh 4 f n 0 t,sro0 „ewo ,,,� 0 <br /> Overflow m a _` „ °� <br /> a' <br /> • Structure a G g Q Q `yorted �'-- "°«8sa• _ e s.rp V <br /> " aRailroad Track Rertwved m '�''q1• m• a co 072"RCP Pile Supp Sectiovego <br /> (Approx. 918 L.F.) '2 <br /> �z+ro <br /> "� <br /> + <br /> 8 <br /> SS- <br /> • <br /> • Snohomish River <br /> • <br /> • LEGEND <br /> • Centerline of Proposed Road Fill <br /> • <br /> • ---- --- 72"CS Pipeline Alignment (RCP- 1992) <br /> • 48"CS Pipeline Alignment(PCCP- 1982) 0 100 200 <br /> • SCALE IN FEET <br /> • 60"CS Pipeline Alignment(60" Brick- 1914/54" HDPE Sliplined - 1992) <br /> • 9-74% Borehole Location <br /> Pot Hole Location <br /> • <br /> • <br /> Figure 2 <br /> • PAACAMPROJECT1EverettlEclipse Pipeline ProtectionlReport1Fig25ite.dwg Site Plan <br /> Mod:05/13/2009,16:31 I Plotted:05/15/2009,14:58 I john_knobbs <br /> ECLIPSE MILL ROAD-PIPELINE PROTECTION PROJECT <br /> • Everett,Washington <br />