My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR WATERFRONT PLACE APARTMENTS 2021-06-09
>
Address Records
>
W MARINE VIEW DR
>
1300
>
WATERFRONT PLACE APARTMENTS
>
1300 W MARINE VIEW DR WATERFRONT PLACE APARTMENTS 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 8:17:28 AM
Creation date
6/9/2021 8:17:16 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Tenant Name
WATERFRONT PLACE APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, sN , (A \C3t0(4 "' COCO t <br /> 41. <br /> i PUBLIC WORKS DEPARTMENT F� 1 <br /> r":1 Utilities Division,3200 Cedar Street (A)Kt.L.0 0'n� S 1 3 B` <br /> Everett WA 98201 <br /> 425-257-8800 <br /> COST ES't EviA i 1.S1-IFF1 <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $1352.00 Service Order# <br /> Contact Person Kyle Weeks Telephone# 206 588-1147x122 <br /> Requested By Sabrina Fandler Date of Request 10-17-2018 <br /> Property Owner(name) Sealevel Properties <br /> Charge Cost to(name if different than owner) ' <br /> Address 9675 SE 36th St,Ste 105 City Mercer Island,WA Zip 98040 <br /> Installation Location 1300 W Marine View Dr <br /> Installation type/description/size/etc. Connect existing 6" D.I.stub to contractor installed 6"for <br /> Fire service into vault w/DCDA inside. Contractor to excavate, shore and restore. <br /> 0 The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof,and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $742.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $476.00 Matt Welborn <br /> Equipment Rental $70.00 Randy Allen <br /> Paul McKee <br /> Tax $64.00 Jim Spooner <br /> Restoration Sabrina Fandler <br /> Benyam Stephanos <br /> TOTAL $1352.00 Grant Moen <br /> Prepared by: Jim Spoone Date Estimate Prepared 2-26-2019 <br /> Accepted by: i1 / (4 (., Representing t 4 fp.,o - PL/` if) <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:ViCommonlclericaliCost.est1201811300 WMVD 6 inch FS CEFP <br /> 1oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.