My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2514 RAINIER AVE 2022-03-01
>
Address Records
>
RAINIER AVE
>
2514
>
2514 RAINIER AVE 2022-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 10:45:56 AM
Creation date
6/9/2021 10:17:56 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2514
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH MIDDLE SCHOOL MODERNIZATION 014100 <br />Everett Public Schools AIR BARRIER SYSTEM <br />NAC Architecture, 121-16027 Page 4 <br />necessity of removing and replacing construction to accommodate <br />inspections and tests. <br />11. The Contractor is responsible for scheduling times for inspections, <br />tests, taking samples, and similar activities. <br />1.3 PERFORMANCE REQUIREMENTS <br />A. Compliance Requirement: <br />1. The entire building: The air leakage of the entire building shall not <br />exceed 0.4 cfm/ft2 under a pressure differential of 0.3 in. water <br />(1.57psf) (2.0 L/s.m2 @ 75 Pa) when tested according to ASTM E 779. <br />1.4 SUBMITTALS <br />A. Unless the Contractor is responsible for this service, the independent testing <br />agency shall submit a certified written report, in duplicate, of each <br />inspection, test, or similar service to the Architect. If the Contractor is <br />responsible for the service, submit a certified written report, in duplicate, of <br />each inspection, test, or similar service through the Contractor. <br />1. Submit additional copies of each written report directly to the <br />governing authority, when the authority so directs. <br />2. Report Data: Written reports of each inspection, test, or similar <br />service include, but are not limited to, the.following: <br />a. Date of issue. <br />b. Project title and number. <br />C. _Name, address, and telephone number of testing agency. <br />d. Dates and locations of samples and tests or inspections. <br />e. Names of individuals making the inspection or test. <br />f. Designation of the Work and test method. <br />g. Identification of product and Specification Section. <br />h. Complete inspection or test data. <br />i. Test results and an interpretation of test results. <br />j. Ambient conditions at the time of sample taking and testing. <br />k. Comments or professional opinion on whether inspected or <br />tested Work complies with Contract Document requirements. <br />1. Name and signature of laboratory inspector. <br />m. Recommendations on retesting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.