Laserfiche WebLink
• PRIVATE WORK • <br />Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />Storm Sewers <br />4 - 6 Inch Pipe <br />L.F. <br />636 <br />20.00 <br />12,720.00 <br />8 Inch Pipe <br />L.F. <br />981 <br />25.00 <br />29,325.00 <br />12 Inch Pipe <br />L.F. <br />153 <br />35.00 <br />5,355.00 <br />Yard Basin <br />Ea. <br />6 <br />200.00 <br />1,200.00 <br />Standard Catch Basin <br />Ea. <br />16 <br />700.00 <br />11,200.00 <br />Extra Depth Excavation, <br />(Over 12' dee <br />Ft./L.F. <br />5.00 <br />48 Inch MH/CB Type II <br />Ea. <br />3 <br />1,800.00 <br />5,400.00 <br />54 Inch MH/CB Type II <br />Ea. <br />1 <br />2,700.00 <br />2,700.00 <br />Extra Depth MH/CB, <br />48 inch per ft. over 12 <br />Ft. <br />110.00 <br />Extra Depth MH/CB, <br />54 inch per ft. over 12 <br />Ft. <br />140.00 <br />Restrictor/Pollution Control, <br />12 Inch Large) <br />Ea. <br />2 <br />1,000.00 <br />2,000.00 <br />CMP Detention Pipe <br />L.F. <br />1,940 <br />125.00 <br />242,500.00 <br />Cleanout <br />Ea. <br />13 <br />750.00 <br />9,250.00 <br />Connect to Existing <br />Ea. <br />6 <br />1,500.00 <br />9,000.00 <br />Trench Drain <br />L.F. <br />89 <br />110.00 <br />9,790.00 <br />Swale <br />LF <br />205 <br />5.00 <br />1,025.00 <br />Storm Sewers Total: $ 314,465.00 <br />/J <br />COST EST FEE CALC - 2016 <br />