Laserfiche WebLink
• Drainage Report <br />NAC Architecture <br />Coughlin Porter Lundeen <br />Project No. C160030-01 <br />June 4, 2018 <br />TABLE OF CONTENTS <br />I. PROJECT DESCRIPTION...........................................................................................................................1 <br />11. SITE ASSESSMENT....................................................................................................................................2 <br />TOPOGRAPHY................................................................................................................................................2 <br />DRAINAGE.......................................................................................................................................................2 <br />SOILS................................................................................................................................................................2 <br />GROUNDCOVER............................................................................................................................................2 <br />CRITICALAREAS............................................................................................................................................3 <br />ADJACENTAREAS.........................................................................................................................................3 <br />111. SITE DEVELOPMENT PLAN WITH ON -SITE STORMWATER MANAGEMENT......................................4 <br />PROJECT THRESHOLDS...............................................................................................................................4 <br />MINIMUM REQUIREMENTS...........................................................................................................................5 <br />IV. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN.....................................................7 <br />CONSTRUCTION STORMWATER GENERAL PERMIT...............................................................................7 <br />LAND DISTURBING ACTIVITY.......................................................................................................................7 <br />• V. SOURCE CONTROL PLAN.........................................................................................................................8 <br />VI. SPECIAL REPORTS AND/OR STUDIES....................................................................................................9 <br />VII. OTHER PERMITS......................................................................................................................................10 <br />VIII. PERMANENT STORMWATER CONTROL PLAN....................................................................................11 <br />OFF -SITE ANALYSIS....................................................................................................................................11 <br />PRE -DEVELOPED HYDROLOGY................................................................................................................11 <br />DEVELOPED HYDROLOGY.........................................................................................................................11 <br />STORMWATER TREATMENT PLAN...........................................................................................................11 <br />STORMWATER FLOW CONTROL PLAN....................................................................................................12 <br />MAINTENANCE AND OPERATION PLAN...................................................................................................12 <br />FIGURES............................................................................................................................................................13 <br />FIGURE 1 —VICINITY MAP...........................................................................................................................13 <br />FIGURE 2A — EXISTING CONDITIONS: MAIN SITE...................................................................................13 <br />FIGURE 2B — EXISTING CONDITIONS: FIELD...........................................................................................13 <br />FIGURE 3A— PROPOSED CONDITIONS: MAIN SITE...............................................................................13 <br />FIGURE 3B — PROPOSED CONDITIONS: FIELD.......................................................................................13 <br />FIGURE 3C — PROPOSED CONDITIONS: FIELD ALTERNATE................................................................13 <br />FIGURE 4A — EXISTING CONDITIONS: RIGHT-OF-WAY..........................................................................13 <br />FIGURE 4B — PROPOSED CONDITIONS: RIGHT-OF-WAY......................................................................13 <br />APPENDICES.....................................................................................................................................................14 <br />• APPENDIX A — INTERIM POLICY................................................................................................................14 <br />APPENDIX B — CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ...........................14 <br />COUGHLINPORTERLUNDEEN <br />,i. 'V1t. 1E. .;C r`NG N E E ; y{; <br />