Laserfiche WebLink
NORTH MIDDLE SCHOOL <br />STORMWATER FLOW CONTROL PLAN <br />. Minimum Requirement #7: Flow Control requires stormwater discharge to "match developed discharge durations <br />to predeveloped durations for the range of predeveloped discharge rates from 50 percent of the 2-year recurrence <br />interval peak flow up to the full 50-year peak flow." <br />1�i <br />• <br />As noted above, the continuous modeling software MGS Flood was used to determine the design durations and <br />flow rates for the pre -developed and developed conditions. Calculated results are included in Appendix C. To <br />comply with Minimum Requirement #7, detention is not required for this site. The peak flows for the post - <br />developed are less than the peak flows of the pre -developed. This is because the landscaped area for the <br />proposed site are greater than the existing landscaped area (See Figure 3A — Proposed Conditions). <br />In the event that the athletic field alternative is chosen, a flow control system in the way of a CMP pipe system will <br />be provided. This detention system will be located under the west parking lot within the main site with runoff from <br />the field being routed to the system via an 8 inch pipe that collects runoff from the field underdrain system. <br />Approximately 4.2 acres of impervious (synthetic) field and surrounding areas were input into MGS Flood to <br />determine 10 connecting pipes at 194 ft each with a 4 ft diameter will be needed. (See Figure 3A — Proposed <br />Conditions). The existing field was modeled with 3.609 acres of pervious field and 0.657 acres of impervious <br />gravel and other field structures. The proposed field alternative was modeled as 100% impervious. The total <br />volume of runoff being detained by this system is 24,400 cu-ft. Calculated results for the field alternative are <br />included in Appendix C. <br />MAINTENANCE AND OPERATION PLAN <br />A Maintenance and Operations Plan is included in Appendix E which addresses Minimum Requirement #9: <br />Operation and Maintenance. <br />COUGHLINPORTERL.UNDEEN 12 <br />