Laserfiche WebLink
4/21/2021 <br />City of Everett <br />Page 5 <br />10:32:41.ecM <br />/ p <br />INSPECTION <br />ACTIVITY REPORT <br />4/9/2019 4/9/2019 <br />BLDG <br />TMB <br />PARTIAL APPR <br />eTRAKiT Inspection <br />4/8/2019 2:43 PM SPEE WEST CONST <br />11-INSULATION <br />Request <br />CO <br />Contact Name: SPEE WEST CONST CO <br />Site Address: 2514 RAINIER AVE <br />Phone:2067192045 <br />e-Mail: skingma@speewest.com <br />(4/10/2019 8:43 AM TMB) <br />Library Walls @ mezzanine. <br />4/25/2019 4/25/2019 <br />BLDG <br />DWF <br />CORRECTION <br />eTRAKiT Inspection <br />4/24/2019 3:43 PM SPEE WEST CONST <br />11-INSULATION <br />Request <br />CO <br />Contact Name: SPEE WEST CONST CO <br />Site Address: 2514 RAINIER AVE <br />Phone:2067192045 <br />e-Mail: skingma@speewest.com <br />(4/25/2019 9:32 AM DWF) <br />Need mechanical RI sign off before <br />insulation inspection. <br />5/6/2019 5/6/2019 <br />BLDG <br />DWF <br />PARTIAL APPR <br />eTRAKiT Inspection <br />ok to continue drywall. <br />09-DRYWALL <br />Request <br />Note: have eletrical\, mechanical, plumbing <br />and fire RI sign offs before cover. <br />5/6/2019 5/6/2019 <br />BLDG <br />DWF <br />PARTIAL APPR <br />eTRAKiT Inspection <br />exterior walls ok to covers. <br />11-INSULATION <br />Request <br />5/6/2019 5/6/2019 <br />BLDG <br />DWF <br />PARTIAL APPR <br />eTRAKiT Inspection <br />Exterior soffit at SE entrace area <br />08-FRAMING <br />Request <br />and North side of Court yard, soffit 3/4" <br />fire rated plywood installed. <br />Contract to complete install of TEC screws <br />and dicussed, some sheet missing screws, <br />then ok to cover. <br />Also soffit in rooms 132, 132 and 131 ok to <br />cover. <br />6/26/2019 6/26/2019 <br />BLDG 12-CEILING <br />DWF <br />PARTIAL APPR <br />eTRAKiT Inspection <br />2nd floor ceiling grid, borders only - <br />GRID <br />Request <br />allowed to be installed. 2x4 light pods not <br />hooked up yet. <br />And still need electrical, mechanical and <br />fire dept sign off. <br />1st floor ceiling grid needs to be verified <br />that electrical, mechanical and fire dept <br />have sign off before cover. <br />7/3/2019 7/3/2019 <br />BLDG 12-CEILING <br />TMB <br />PARTIAL APPR <br />eTRAKiT Inspection <br />7/2/2019 2:57 PM SPEE WEST CONST <br />GRID <br />Request <br />CO <br />Area B 1st floor administration rooms. Can <br />you please call to let me know what time <br />you can come out. Thank you. <br />Contact Name: GK Knutton <br />Site Address: 2514 RAINIER AVE <br />Phone:3604219008 <br />e-Mail: nick@gkknutson.com <br />(7/3/2019 10:24 AM TMB) <br />Partial Approval: Areas listed ok to cover. <br />7/9/2019 7/9/2019 <br />BLDG 12-CEILING <br />DWF <br />PARTIAL APPR <br />eTRAKiT Inspection <br />7/2/2019 2:58 PM SPEE WEST CONST <br />GRID <br />Request <br />CO <br />Ceiling cover Area A 2nd floor classrooms. <br />PM inspection. <br />Contact Name: GK Knutson <br />Site Address: 2514 RAINIER AVE <br />Phone:3604219008 <br />e-Mail: nick@gkknutson.com <br />(7/9/2019 2:29 PM DWF) <br />2nd floor, area A class rooms - ok to cover <br />INSP12 <br />